PROJECT alffKAt.....................................................
nE.SCRU’flON: Metropolitan Transportation Authority
Cu r re n / Co n dif io ns;
sit The current station is configured as a loop, and the
platform only accommodates 5 of the 10-car subway trains. As a result, the
I
passengers in the rear five cars must walk to the first five cars in order to
exit the train. The loop configuration also hinders efficiency throughout the
entire 1/9 line. Currently, there is a connection to the Staten Island ferry,
but no direct passenger connections to other subway lines.
I
Estimated ScAedu/e and Cost
3 to 4 years
S400 million
K and lmj)act:
► Value to Lower Manhattan;
• The service improvement will increase capacity throughout all of the 1/9
I line, reducing travel time for commuters traveling to Lower Manhattan
from Penn Station.
I
K ► Overall Impact:
8
• Accommodates loading of full-length 10-car trains.
■ • Additional entrance created.
I • Improves reliability, on-time performance, and travel time for
Manhattan’s West Side subwav service.
• Provides a new free connection between the 1/9 line at South Ferry and
the N/R line at Whitehall St.
• Given that Staten Island is the fastest growing of the five boroughs --
and that its population growth rate will be among the top half of coun
ties in the region over the next 25 years -- improvements to South Ferry
station will help to accommodate increased Staten Island ferry ridership.
• Provides ADA (American Disabilities Act) accessibility
(Y/ZTe’/zZ S/a/z/.v;
Currently in planning stage
I
I
Chapter I; Restoring; and Renewi ,'i iM.anli.it tan's I l ansportation linf rascructure 29