NYC 9/11 Public Portal Document
Bh, M InfyMnunur^
but requires allocating more of Lower
Manhattan's limited street and curbside capac
ity to buses during peak commuting hours,
thus potentially impacting other vehicular
operations.
A number of strategies are being considered to
address the concerns regarding buses making
Queutng passengers crowding Lower Manhattan sidewalks as
stops through Lower Manhattan. MTA New they wait at their bus stop.
York City Transit is evaluating options for developing an Advanced Traveler Information System
(ATIS), which would allow information on the status of bus service, including bus arrival times, to
be provided at each bus stop. Extensively used on European bus systems, ATIS is now being
implemented in the United States, including the "Metro Rapid" bus system in Los Angeles, and a
demonstration project on the 22-Rllmore bu.s line in San Francisco.
Opportunities may also exist to enhance the "street furniture" and aesthetic appeal at bus stops. In
the same way that MTA's Fulton Street Transit Center will provide a gateway to subway service
for the Lower Manhattan area, newly designed bus stops and waiting areas could potentially pro
vide a gateway for surface transit services. Portland's Tri-Met bus system for example, which has
outfitted downtown bus stops with distinctive bus stop pavilions providing sheltered waiting areas
and comprehensive route information, suggests an approach which could benefit Lower
Manhattan.
A second concept examined in the bus study focused on development of off-street, full service
commuter bus terminal operations in Lower Manhattan, a perennial proposal that attracted
renewed attention after the September 11th attacks. The consultant team determined that two
facilities would be needed — one to intercept Brooklyn and Staten Island buses using the
Brooklyn Battery Tunnel, and another for Holland tunnel buses. These facilities would include
berths for loading/unloading, ticketing and waiting areas for passengers, as well as bus storage.
Passengers would exit and board buses at the terminals in lieu of on-street service for most
routes. This approach would take buses off much of the local, street network, but require most
passengers to walk further (unless the terminal concept incorporated shuttle bus services).
Though the consultant team concluded both options were viable, the interagency group agreed
that the enhanced on-street operations concept offered a better level of service to passengers and
supported more efficient bus operations, especially if buses were to be given priority treatment
38 l.ower Manhattan rnuisjwrtation Strategies
NYC-WTC_000143094
OCR can misread numbers and units. Confirm readings against the page image before using them.