Section of an environmental assessment describing existing physical conditions and construction impacts at the World Trade Center site.

NYC-WTC_000141695–000141705

Folder label: “FEMA Equipment Requests Emergency Expenses

Page image
Scanned page image, NYC-WTC_000141696
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Table 3-1 (continued)

WTC Disaster Building Status September 2001 Identification Building Name FDNY Sector V

6 SIS® WTC Custom House West Major Structural Damage 7 WTC Tishman Center West Destroyed 8 North Bridge West 9 1 Liberty Plaza Church Major Damage 10 Millenium Hotel Vesey Damaged/Repairable 11 East River Savings Vesey/Church Damaged/Repairable Bank 12 Federal Building/Post Vesey Damaged/Repairable Office 13 N.Y. Telephone Co. West Major Structural Damage 14 WFC Amex & Lehman West Major Structural Bros. Damage 15 WFC Merrill Liberty Major Structural Lynch/Winter Garden Damage 16 South Bridge Liberty Damaged 17 WFC Dow Jones Liberty Damaged/Repairable Oppenheimer 18 St. Nicholas Greek Liberty Destroyed Orthodox Church 19 90 West Street Liberty Damaged/Repairable 20 Bankers Trust ChurcL Major Structural Damage

The NYC financial district and the stock market were closed for approximately one week following the WTC disaster and over 13,000 businesses have been directly impacted. Consolidated Edison (“ConEd”) Substation in lower Manhattan was destroyed and four electric networks in lower Manhattan were shutdown. The natural gas distribution system in lower Manhattan was shutdown for at least a week after the disaster and Verizon lost service from the Operations Center at 140 West Street which affected 200,000 telephone caH’ ;., ^xcs, mostly in the financial district (Wall Street). George Washington Bridge was closed eastbound and Interstate 95 (1-95) traffic was disrupted for several weeks following the disaster. All bridges and tunnels in lower Manhattan were initially closed except to emergency vehicles. The Holland Tunnel was closed until October 8,2001; this restricted access to 1-78. Twelve New York City public and private schools in the area south of 14**’ Street were closed for at least a week following the disaster and one fire station was destroyed. Battery Park City, a 92-acre upscale residential and commercial development west of the WTC site along the Hudson River,

3-2

NYC-WTC_000141696

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000141696Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →