NYC 9/11 Public Portal Document
APR-24-2002 ^3:00 U.S. EPA/DEPP 212 6373772 P.04/06
** - *
Projecteti Cpst'. $5 million. This cost is higher than in the above efforts because it will involve
sampling for several potential indicators of WTC related contamination before work is
commenced, will involve use of several modifications of cleaning techniques with post
clean up sampling and re-cleaning if necessary.
Statt4s pfRequestforFEMA mission assignment: Submitted as revised 4/11/02. Awaiting
approval.
4. Cleaning of Debris-Laden Unoccupied, Uncleaned Buildings
Objective: Since the debris removal from the immediate areas of destruction in the WTC complex
is nearing completion, the remaining unoccupied, uncleaned buildings must be cleaned.
This will prevent debris/dust from being re-entrained in air and/or re-contaminating the
nearly areas with debris/dust.
Program: NYC will clean the remaining^unoccupied (residential and commercial), uncleaned
buildings near the WTC site that contain WTC-debris. NYC will w'ork with building
owners to determine reasons that these buildings have not been cleaned yet. If building
owners are not able to expeditiously clean their property, NYC will proceed.
Projected COst: $20 million, based upon estimates approximately $2 million/building for 10
buildings. Inventory of buildings is being identified by NYC and may be decreased as a
result of NYC’s efforts to get building owners to conduct clean up.
Status ofRequest for FEMA mission assigtiment: Awaiting initial FEMA feedback
I
5. Clean Up of Exteriors of Buildings with Residual Debris/Dust
Objective: To eliminate remaining debris/dust resulting from the WTC collapse on building
exteriors in Lower Manhattan thereby assuring this material will not become re-enlrained
in the air at a future time, thus creating a potential exposure to the public.
Program: NYCDEP will contract for the cleaning of the exteriors of approximately 250
buildings in Lower Manhattan. EPA, NYCDEP and OSHA will oversee contractors.
Projected Cc^t: NYC $10,28 Million
Project Period: April 2002 through November 2002
Statr/s of Requestfor FEMA mission assignment: FEMA funding approved pending resolution of
indentoification issues.
6. Identificatjion and Inspection of HVAC Systems in Lower Manhattan,
Objective: Evaluate whether further actions are required for central, recirculating HVAC systems
in residential buildings in Lower Manhattan wliich may have been impacted by the
debris/dust from the WTC building collapse.
Program: NYC will retain a consultant to identify central, recirculating HVAC systems in
residential buildings in Lower Manhattan which may have been impacted by the
3
I
I
NYC-WTC_000141481
OCR can misread numbers and units. Confirm readings against the page image before using them.