NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 05/SCOPES OF WORK IN DOOR AIR & CLEANING
Document / 7 pages

Scope of Work: WTC apartment cleanup and air sampling coordination,

Machine-extracted title · confidence 90%

Details project scope for scheduling, coordinating, and monitoring dust and debris cleanup with air sampling from apartments affected by World Trade Center collapse.

NYC-WTC_000140337–000140343

Folder label: “SCOPES OF WORK IN DOOR AIR & CLEANING

Page image
Scanned page image, NYC-WTC_000140337
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Indoor Air Residential Assistance Program 1ft Monitoring Contract Scone of Work Draft - 6/10/02

A. Introduction All work performed under this contract must be in compliance with all applicable, and appropriate regulations and this Scope of Work, including but not limited to those of the United States Environmental Protection Agency (USEPA), the United States Department of Labor, Occupational Safety and Health Administration (USOSHA), the New York State Department of Labor (NYSDOL), the New York State Department of Health Environmental Laboratory Approval Program (ELAP) and the New York City Department of Environmental Protection (NYCDEP), This project shall involve scheduling, coordinating and monitoring the clean up of dust/debris and air sampling fi-om building apartments impacted by the attack and collapse of the World Trade Center.

B. Roles and Responsibilities The USEPA On-Scene Coordinator (OSC) has overall responsibilityfor insuring that work conducted as part ofthe Indoor Air Residential Assistance Program is completed safely, efficiently and in a compliance with the Scope of Work As such, the OSC or designee shall have thefollowing authorities relating to work conducted under this contract:

L The OSC has the authority to stop workfor health and safety reasons orfor non- compliance with the Scope of Work.

2. The OSC has the authority to direct the contractor in the performance of the work.

3. The OSC has the authority to review and approve or disapprove ofthe qualifications of all contractor personnel involved in the work

4. The OSC has the right to inspect and accept or reject any work.

[ input DEP Roles and Responsibilities for contract officer and project manager]

C. Qualifications Proof of qualifications must be presented upon request, including qualifications for wipe sampling, personal monitoring, HVAC and mold expertise.

. Project Monitors The Project Monitors must possess valid NYS Asbestos Project Monitor certificates. Project Monitors must have served as a third party project monitor on at least 20 asbestos abatement projects. Project Monitor must have performed final clearance inspecti .ns on at least 50 asbestos abatement projects. The Project Monitor must have access to translation services to conduct scheduling visits with residents

7

NYC-WTC_000140337

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000140337Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000140281 · Box DEP Box 05

Draft contract scope defining regulations and procedures for asbestos cleanup and air sampling assistance programs in Lower Manhattan.

Filed in the same folder

Compare copies and versions →