NYC 9/11 Public Portal Document
compactor rooms and elevators interiors. If elevator shafts are determined to contain significant
WTC dust and or debris, cleanup will proceed under the Scope B site specific work plan.
Work will begin from the entrance and continue through all common spaces in an orderly
fashion. If the Project Monitor in consultation with EPA determines that an HVAC system uM
requires cleaning, the cleaning contractor shall clean the HVAC system utilizing specialized "• (to
labor trained and experienced in duct cleaning.
6. Cleaning of Residential Spaces
All horizontal hard surfaces shall be HEPA vacuumi d and wet’wii Vertical and soft
surfaces shall be HEPA vacuumed two times. Surface i include but a 4 limited to walls.
floors, ceilings, ledges, trims, furnishings, appliana ‘quipment, etc ;apsqlating agents
shall not be applied. Dry sweeping is prohibited1. Cleanin^H cloth g and accessories
(handbags, shoes etc.)shall be the responsibility of tlhe occupy. A detail description of the
minimum cleaning requirements is as follows: |
a. Terraces, balconies, exterior window sills, wi: aw wells and window guards that are
accessible from the interior of the dwelling, Il be cleaned.
b. Interior windows, screens, window sills and window gu .trds w ill be cleaned
c. Vacuuming will begin at the ceiling and ci'iitinue down^ the walls to the floor.
d. Carpets, curtains, fabric window treatment.s, u pho I.stay, a id other materials that cannot
be cleaned by wet wiping shall-be HEPA vacuumed) Carpets will be
vacuumed using an agitator bafi FabriCfCOv :d furniture will be vacuumed using a
stiff brush attachment.
e. Wooden floors will be damp mopped^dr HEPA vacuumed if unfinished in consultation
with resident
f. Plants shall be cleaned by rinsing leaves with water.
g- Paperwork, books shall be HEPA vacuumed.
h. Electrical outlets, baseboard heating elcments will be vacuumed.
i. Window air conditionerss will be vacuumed then removed from their position and
vaci internally. ; .will be HEPA vacuumed and reinstalled. Air conditioners
will galled aft<
j- Intake/ „-regisfi HVAC systems (if present) will be removed/cleaned. The
first foot ^f duct work will also be vacuumed, then the register will be replaced and
covered with plastic.
Appliances such aS refrigerators and stoves will be cleaned and moved. The floor
footprint of the appliances will be cleaned and the appliance will be reinstalled in its
original position.
Refrigerator cooling tubes will be brushed and vacuumed.
Si irage drawers will be vacuumed if present. Stove cook tops will be opened and
vacuumed. Stove exhaust fan filters will be cleaned .
The first foot of all exhaust duct work (including stove, dryer and bathroom vents) will
be vacuumed. Exhaust fans will be vacuumed and wiped.
o. Closet interiors will be vacuumed.
fl Solid objects (electrical equipment, exercise equipment, etc.) will be wet wiped,
moved to allow cleaning of the underlying surface and will be returned to their original
location.
NYC-WTC_000140329
OCR can misread numbers and units. Confirm readings against the page image before using them.