NYC 9/11 Public Portal Document
Guidance for Ventilation System Evaluation Form
Page 1 of?
GUIDANCE FOR COMPLETING THE VENTILATION SYSTEM EVALUATION FORM
Part 1.0 General Information
Prior inspection report and/or ventilation system maintenance record available for review?
Please request and identify any records maintained by building owner or representatives of post-
9/1 1 inspections of the building or ventilation system, cleaning, repairs, or any other post-9/11
related activity.
Other comments:
Make comments that are relevant to the determination of WTC dust in the building. Appropriate
comments may include relevant historical information such as whether the building ventilation
systems were operating throughout the WTC collapse. In the absence of prior inspection or
maintenance records, it would be appropriate to comment on any cleaning or other modifications
to the ventilation system post-9/11.
Ventilation system types:
Central ventilation system - refers to an air handling system that includes supply and return air
(the air handling system may also take in outside air). A central ventilation system will typically
service common areas such as lobbies, corridors, stairwells, etc.
Mechanical make-up air system - refers to a fan-operated system designed to bring outside air
into the building. Mechanical make-up air systems frequently service areas where make up air is
required for the operation of other equipment such as boilers, clothes dryers, or kitchen exhaust
systems.
Mechanical exhaust system- refers to a fan-operated system used to remove air, moisture and
odors from the building, and primarily includes bathroom and kitchen exhaust systems.
Passive shaft/duct - refers to a non-mechanically ventilated shaft that is used for passively
transferring either make-up air into the building or exhaust air out of the building.
Other ventilation system - refers to any heating, ventilating or air conditioning system
encountered by the HVAC Evaluator that does not fall into one of the above categories.
Part 2.0 Visual Inspection Forms
2.1 Central Ventilation System
Perform the most vigorous visual inspection possible. Minimum inspection equipment should
include screwdrivers, a utility knife (for opening panels, diffusers, grilles, etc. that are painted or
caulked in place), cordless drill, hole plugs, telescoping mirror, flashlight, and portable
NYC-WTC_000139968
OCR can misread numbers and units. Confirm readings against the page image before using them.