NYC 9/11 Public Portal Document
The Project Monitor shall record all post-cleaning information in the EPA Indoor Air
database or an agreed upon electronic format. This information shall include, but is not
limited to sampling technique (aggressive or modified aggressive), visually cleaned (Y/N),
damage claim (Y/N), and post cleaning status (pass/fail). Dates and times shall be associated
with all activities including start and finish date.
Additional information including but not limited to, absence of dust/debris,,:j^^ipment used
(leaf blower, fan etc.), size of space, start and completion dates for the cleaning, sample
media, flow media type, flow rates (start/final, flow r^e (average), lane (start/finish), total
elapsed time (min), calculated sample volume (L), pug^^lt. nits, QC samples (lot
W:
blank), sampling dates, sample IDs, complete chain teistody^ ■pject Tracking
Numbers and laboratory address shall be entered ;o an agpei UI sonic format or
website approved by EPA within 24 hours of actt Dates and times I be associated
with all activities including start and finish date. o
IHb
16. The Project Monitor will conduct a post-cleaning inspection o le residence with the resident
at the completion ofthe sampling. The resident should inspec ^^sidence and identify any
damage at this time and sign-off on the Project Completion rm. Any damage or loss to
a residence or its contents shall be documented OU this form.
..::O
Deliverables
J
The Project Monitor shall J^oit upoh request the EPA copies of the log book as
requested via fax or alternative format,:|P^eed upon and within two days of request. Final air
sampling shall be performed with 24J|urs of visual inspection.
17. T] J Project MoflhorsjWf comply a daily report which documents cleaning starts,
[tinuations, complete air sampling, recleaning and any delays or difficulties
eni IIII&
Deliverables
■IB W
Project M<^ B/submit upon request the completed Project Completion Form to
ilFthe into the EPaI & web database or an agreed upon alternative electronic format or
website approve|By 'A within 24 hours of activity
JI
ifeife. EPA will no) fy residents of the results of sampling conducted as part of this project. No
otter party b authorized to release residential or common area sampling results.
1 ^^W^age to or loss of private property that occurs during sampling or is caused by the
Monitoring Contractor or its’ employees while engaged in activities covered by this scope of
work is the responsibility of the Monitoring Contractor. The Monitoring Contractor is not
responsible for damage or loss caused by the acts of third parties not involved in activities
12