NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 03/E-Mails Sent M. Gilsenan 2001-2002
Document / 22 pages

DEP memo on EPA scope of work roles and indemnification,

Machine-extracted title · confidence 50%

Memo discusses finalizing agency roles in the monitoring program and addresses required indemnification letters and right of entry issues.

NYC-WTC_000139830–000139851

Folder label: “E-Mails Sent M. Gilsenan 2001-2002

Page image
Scanned page image, NYC-WTC_000139842
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

The Project Monitor shall record all post-cleaning information in the EPA Indoor Air database or an agreed upon electronic format. This information shall include, but is not limited to sampling technique (aggressive or modified aggressive), visually cleaned (Y/N), damage claim (Y/N), and post cleaning status (pass/fail). Dates and times shall be associated with all activities including start and finish date.

Additional information including but not limited to, absence of dust/debris,,:j^^ipment used (leaf blower, fan etc.), size of space, start and completion dates for the cleaning, sample media, flow media type, flow rates (start/final, flow r^e (average), lane (start/finish), total elapsed time (min), calculated sample volume (L), pug^^lt. nits, QC samples (lot W: blank), sampling dates, sample IDs, complete chain teistody^ ■pject Tracking Numbers and laboratory address shall be entered ;o an agpei UI sonic format or website approved by EPA within 24 hours of actt Dates and times I be associated with all activities including start and finish date. o IHb 16. The Project Monitor will conduct a post-cleaning inspection o le residence with the resident at the completion ofthe sampling. The resident should inspec ^^sidence and identify any damage at this time and sign-off on the Project Completion rm. Any damage or loss to a residence or its contents shall be documented OU this form. ..::O Deliverables J The Project Monitor shall J^oit upoh request the EPA copies of the log book as requested via fax or alternative format,:|P^eed upon and within two days of request. Final air sampling shall be performed with 24J|urs of visual inspection.

17. T] J Project MoflhorsjWf comply a daily report which documents cleaning starts, [tinuations, complete air sampling, recleaning and any delays or difficulties eni IIII&

Deliverables ■IB W Project M<^ B/submit upon request the completed Project Completion Form to ilFthe into the EPaI & web database or an agreed upon alternative electronic format or website approve|By 'A within 24 hours of activity JI ifeife. EPA will no) fy residents of the results of sampling conducted as part of this project. No otter party b authorized to release residential or common area sampling results.

1 ^^W^age to or loss of private property that occurs during sampling or is caused by the Monitoring Contractor or its’ employees while engaged in activities covered by this scope of work is the responsibility of the Monitoring Contractor. The Monitoring Contractor is not responsible for damage or loss caused by the acts of third parties not involved in activities

12

NYC-WTC_000139842

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000139842Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →