15 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗Forwarding 125 Cedar Street inspection report and guidelines, Aug 2002
Machine-extracted title · confidence 95%DEP forwards inspection report for 125 Cedar Street along with NYC guidelines on fungal remediation.
NYC-WTC_000139389–000139394Folder label: “2002 E-Mail Sent M. Gilsenan”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
DRAFT New York City Department of Environmental Protection Bureau of Environmental Compliance
Monitoring Contractor Scope of Work for 114 Liberty Street, Manhattan
Background
A follow-up visit to 114 Liberty Street revealed minor dust accumulations present on surfaces within the interior of the building. The interior cleaning is to be accomplished by a licensed asbestos abatement contractor and monitored by a Monitoring Contractor.
Purpose
The Monitoring Contractor shall provide personnel experienced, trained, and certified in environmental sampling and asbestos air monitoring to be on-site, full-time, during work area preparation and cleaning phases of building interiors (11 stories plus a penthouse -5,000 to 6,000 square feet per floor). Each apartment occupies an entire floor. The building has central HVAC systems on each floor. The Monitoring Contractor shall provide qualified staff to observe the work, conduct air monitoring, and monitor the cleanup of the building interiors to ensure compliance with the project specifications and appropriate regulatory requirements. The Monitoring Contractor shall provide clearance sampling and analyses.
The Monitoring Contractor shall provide qualified staff to collect samples for lead, polyaromatic hydrocarbons (PAHs), dioxin, fibrous glass, crystalline silica and mercury.
An accredited laboratory shall perform all sample analyses.
The Work shall be performed 24 hours per day, seven (7) days per week
Air Monitoring/Construction Inspection Services
Air monitoring by a Monitoring Contractor shall be conducted during all cleanup activities. The Monitoring Contractor shall provide individuals certified as project monitors and air sampling technicians to perform daily air sampling and inspections from the commencement of the project through final air clearance sampling. The Monitoring Contractor shall provide sufficient equipment and experienced personnel to monitor work area preparation and cleaning phases of the building interiors.
Qualifications
Project Monitoring The Project Monitors must posses valid NYS Asbestos Project Monitor certificates. Monitors must have served as a third party project monitor on at least 25 asbestos abatement projects. Project Monitor must have performed final clearance inspections on at least 25 asbestos abatement projects. A single individual with Asbestos Project Monitor and Asbestos Project Sampling Technician certification shall not perform the functions of both Monitor and Technician during this project. 1 of 5
NYC-WTC 000139390
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
Filed elsewhere
15 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155138
Documentation of sample chain of custody procedures for the 114 Liberty Street site.
14 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000156050
Document tracking the chain of custody for environmental samples collected at 114 Liberty Street on August 22, 2002.
14 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗15 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000139168
Correspondence regarding the finalization of a contractor scope of work for air monitoring at 125 Cedar Street.
14 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000139162
Correspondence regarding the finalization of a contractor scope of work for air monitoring at 125 Cedar Street.
14 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000156019
Document tracking the chain of custody for environmental samples collected at 125 Cedar Street on August 21, 2002.
13 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000163372
Request to send the air monitoring scope document to legal counsel and the sender due to computer access issues.
14 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155841
A single scanned page from the 125 Cedar administrative file containing illegible text or data fields.
14 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000156000
Contractor work scope for air monitoring and environmental surveillance at 125 Cedar building.
14 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000163449
Chain of custody form dated August 22, 2002, documenting transfer of samples or materials between DEP personnel.
14 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000100879
Permit document detailing the installation of a heavy-duty shed and facade repairs at 114 Liberty Street in May 2002.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000163449
Chain of custody form dated August 22, 2002, documenting transfer of samples or materials between DEP personnel.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155138
Documentation of sample chain of custody procedures for the 114 Liberty Street site.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Buildings in this record
Machine-extracted building matches; verify each source. Buildings, never households.
- 114 Liberty Street · 1 pages · confidence 0.00 · verify page 2
- 125 Cedar Street · 1 pages · confidence 0.15 · verify page 1
Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Filed in the same folder
Similar indexed content
Similar indexed content
NYC-WTC_000155138
Documentation of sample chain of custody procedures for the 114 Liberty Street site.
Similar indexed content
NYC-WTC_000156050
Document tracking the chain of custody for environmental samples collected at 114 Liberty Street on August 22, 2002.
Similar indexed content