Shared airshaft dust contamination and recleaning, November 2002

Machine-extracted title · confidence 86%

Correspondence regarding dust accumulation from adjacent facade repointing work in shared airshaft, with commitment to reclean windows and fire escapes.

NYC-WTC_000139196

Folder label: “2003 E-Mails Sent M Gilsenan

Page image
Scanned page image, NYC-WTC_000139196
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Gilsenan, Michael From: Gilsenan, Michael Sent: Tuesday, November 12, 2002 12:28 PM To: Radhakrishnan, Krish Subject: FW: Recleaniing windows and fire escapes in airshaft of 125 Cedar St.

Krish-FYI

---- Original Message---- From: Gerald Pryor [mailto:[email protected]] Sent: Monday, November 11, 2002 2:58 PM To: [email protected] Co: [email protected] ; [email protected]; [email protected] Subject: Recleaniing windows and fire escapes in airshaft of 125 Cedar St.

Dear Kathy,

Thank you for stating that the window sills and fire escapes in the airshaft of 125 Cedar Street will be recleaned as a result of the repointing of the fascade that is taking place at 110 Liberty Street . As you know, 110 Liberty Street and 125 Cedar Street share a common airshaft. During the walkthrough with the DEP and the EPA on Friday November 8,2002, there was at least a 1/2" of white "dust" on all the windows and fire escapes and the blasting of the bricks was causing more to accumulate as we watched. Donald Graham from your office called to say that you had instructed Mike Gilsenan from the DEP that the recleaning should take place in the very near future and that the cleaning would be done by the same contractors who cleaned our interior spaces, ensuring that the tenants of 125 Cedar Street would be able to open their windows without this "dust" blowing inside. Please know that on late Friday afternoon, my wife had a conversation with Krish form the DEP who was unaware that the airshaft was to be recleaned and seriously questioned that the cleaning would take place at all. Perhaps the decision to reclean had not yet been relayed to Krish . We would appreciate being informed when the cleaning will take place. Thank you for understanding the problem and for promptly taking action to rectify the situation.

Sincerely,

Gerald Pryor

1

NYC-WTC_000139196

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000139196Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000107375 · Box DEP Box 38

Notice for mandatory pre-bid meeting regarding asbestos abatement scope of work at 125 Cedar Street (110 Liberty Street).

Cited alongside this record in an Ask answer

Compare copies and versions →