found to be fi-ee ofdebris fi-om the collapse ofthe WTC or shall obtain written authorization fi-om
EPA to proceed. No residential or common space shall be cleaned until the HVAC system has
been evaluated and cleaned as necessary. Ifa scheduling problem arises, the Project Monitor
should contact EPA. The Project Monitor shall coordinate daily access for cleaning and sampling
with residents, owners, the Cleaning Contractor and sampling technicians.
10. The Monitoring Contractor shall provide sufficient personnel to provide periodic (3-4hours/unit)
oversight ofthe Cleaning Contractor to verifythat work is being conducted in accordance with the
Cleaning Contract Scope of Work.
11. The Project Monitor shall verifythat the Cleaning Contractor is usingproperly trained and certified
NYS DOL and NYC DEP certified workers.
12. The Project Monitor shall conduct routine quality assurance inspections during the course of
cleaning and concur by initialing the Cleaning Checklist (to be developed) for tasks completed in
compliance with the Cleaning Contract Scope of Work.
Deliverables
The Proj ect Monitor shall submit the completed Cleaning Checklist via F2L or an agreed upon
alternative electronic format or website approved by EPA within 24 hours ofactivity. TheProject
Monitor shall record daily activities in the field notebook.
13. Personal Air Monitoring
Personal air monitoring shall be performed by the Monitoring Contractor in accordance with US
DOL OSHA requirements. The person who conducts sampling shall possess a valid NYS DOL
APST certificate. Personal airmonitoringwill be performed on a minimum ofone worker per shift
per residence during for the first 6 weeks ofcleaning operations. This maybe extended based on
a determination made by EPA and OSHA. Thereafter personal air monitoring samples will be
taken at one sample per day. All samples shall be collected and analyzed in accordance with the
procedures specified in NIOSH 7400 Method followed by AHERA TEM. Analysis ofthese
samples shall be the responsibility ofthe Monitoring Contractor. Results of analysis shall be
provided to EPA by the laboratory in an approved electronic format within 24 hours ofcollection.
Copies of the results shall also be sent immediately to DEP, OSHA and the employer. The
employer will make these results available to the employees or their designated representatives for
their review in accordance with 29 CFR 1910.1020 and 29 CFR 1926.1101.
The Monitoring Contractor shall document all the necessary information regarding sampling
activities, fill out all field logs, data sheets, and chain-of-custody forms. The Monitoring Contractor
shall use F2L for all sample and chain-of-custody documentation. This data shall be provided to
EPA within 24 hours of completion of the sampling.