asbestos-containing wastes at a minimum. Sampling representability will
be as described in section 6.2.
6.3.5 Fuel
No Fuel Storage is known to exist at the site. Heat for both buildings was
generated by natural gas from the street. Kitchen equipment was fuelled
by the same gas system, and by electricity. Two Phase I Environmental
Site Assessments were conducted for the site. Neither assessment
identified fuel sources or suspected fuel sources.
6.3.6 Fire Extinguishers
In the case of both charged and discharged fire extinguishers, the
manufacturer of the fire extinguisher will be contacted for the proper
discharge and disposal method. Alternately, local fire department(s) may
be contacted to determine if they would like to acquire the charged fire
extinguishers in volunteer or community training exercises. If the above
approaches prove impractical, fire extinguishers shall be depressurized in
accordance with manufacture's recommendations and all regulatory
requirements. Contained media shall be collect upon depressurization,
characterized, and recycled or disposed, if and as required. Empty
extinguisher bodies shall be rendered inoperable by cutting in half or
puncturing, then recycling as scrap metal or disposing as municipal solid
waste. If fire extinguishers are found, the Environmental Consultant will
make a determination.
6.4 Structure & Façade
Sampling of the structure and facade materials will be conducted to
confirm the waste status of the structure and facade prior to
commencement of the demolition phase. For each of the structural and
facade material categories noted at the site, five confirmatory waste
samples will be collected and composited for analysis (one analysis per
material, per building). Samples will be collected from various locations
and functional spaces within each building. Sample representability will
be as described in Section 6.2. Results will be available prior to the
commencement of the demolition phase.
7.0 Non-porous (cleanable) Waste
For cleaned (wet-wiped/HEPA-vacuumed) non-porous deconstruction waste, TCLP
Metals samples will not be collected unless the non-porous components are painted and
to be disposed of (i.e., not recycled). Cleaned painted scrap metals that are recycled are
exempt from the below described waste characterization sampling and analysis. For non-
porous components that are painted, one composite sample made up of a minimum of
14