NYC 9/11 Public Portal Document
Elmsford. Executlw Park 8ulldino 6
__ — — -- 2M Saw W PJv*T Rood ~LYodcaf>5Z3
a• /f O. L / LQ S -- _ Tr3IIPmI01E8/4.948.8000 aF
• o Division. COLE CONSULTING CORPORATION . 914.*6*0W
February 26111, 2003
Mr. Andrew Confortini
EPA Quad B Leader
USEPA, I7'-" Floor
290 Broadway
New York. NY. 10007-1866
• .. .. . .: . . .. .. .~. '. . .
is '.-
Re: WTC HVAC Report for 45 Wall Street. ''
Inspection date : February 21at, 2003
Dear Mr. Confortini,
According to visual inspection conducted by our HVAC Specialist Duct Dusters Air Duct
Cleaning, Environmental Technologies Division, Cole Consulting Corp hereby
recommend that one equipments should be recleaned because WTC dust was found
in the equipments.
Please note that during the visual inspection of the HVAC Units in the above
building, the following under listed units were found to be impacted and should
be cleaned.
I. HVAC Unit: Located in Elevator room and serving Gym and Club 45
All other systems were cleaned properly. Please note that there are Three (3) Central
Ventilation System Units cleaned in this building and re-inspected. This
constitute three (3) inspections.
Please do not hesitate to call me if you have any question with this report.
Yours truly,
Environmental Technologies
John Anuforo
Division Manager