Part 1 ITOR LOG TC PROJECT 4 P ie k: 5. Work Area(s):

I. ent: 4a. Task #: 3. Prcyegt e 1 ~~'b` Date: 8. ATC Representative, 7. Contractor's Foreman ontractor: / fn

Glovebagging Other _- Tent-Containment Full-Containment lin. ft.) Type of Project: ___ Small (< 160 sq. ft.. 260 260 tin. ft. of ACM) Large (> 160 sq. ft., Cleaning Size of Project: Removal Prep Pre-abatement Sampling Phase of Abatement: Finals Waste Load-out Encapsulation

ABATEMENT FULL-CONTAINMENT

room, section): Work Area Location (floor, N/A (If already completed) Yes (Indicate prep work performed in 1 - 10) Yes No Preparation of Work Area: No 2. Ceiling Poly: No Yes Yes 1. Construction of Decon: No 4. Wall Poly: No Yes Yes 3. Critical Barriers (CBs): No 6. Floor Poly Yes No Yes _ 5. Removal to establish CBs: No 8. Pre-cleaning: No Yes Yes 7. Negative air: No 10. Temporary Power: No (Explain why) Yes Passes: Yes -- 9. Prep work completed: No 12. Prep-Inspection Yes 11. Other N/A Yes (Complete I - 5) Ceiling Tile Removal: Fireproofing

LI Duct Insulation _ Other: Pipe Insulation Transite Boards Floor Tile 1. Type of ACM: - Boiler Insulation Yes No Yes No 3. Amended water used during removal: Yes No 0.02 in. of water: --- 2. Negative air pressure ≥ Yes No 5. Proper Decon procedures followed: N/A shift's duration: 4. Critical barriers intact for Yes (Complete 1 - 6 ) Cleaning: after 1st cleaning: 2. 12/12-hour waiting period Yes N' 3rd Stage 1, 1st Stage _ 2nd Stage Yes No 4. 4/12-hour waiting period after 2nd cleaning: cleaning: 3. Removal of 1st poly layer after 1st cleaning:- Yes No 6. 1/12-hour waiting period after 3rd cleaning: Yes N 5. Removal of 2nd poly layer after 2nd ABATEMENT TENT-CONTAINMENT

(floor, room, section): Work Area Location N/A (it already completed) Yes (Indicate prep work performed in 1 .6) Preparation of Work Area:

Yes No 2. Pre-cleaning: _ No N/A Yes No Yes 1. Construction of Tent: No 4. Negative Air: Yes No Decors Yes passes: 3. Construction of 6. Pref-inspection completed: Yes No 5. Prep work Ceiling Tile Fireproofing Remova1•. Duct Insulation Other: ~ Pipe Insulation Transite Boards Floor Tile 1. Type of ACM: Boiler Insulation Glovebag removal within tent (check 3 through Gross removal within tent

• 2 Method or Removal:

(If Glovebag Removal Check 3 through 8) 3. Glovebags smoke-tested: Yes Yes No No 4. Glovebags attached to smooth surface: 6. Removal included cleaning and encapsulation: Yes Yes Yes No Nc Nc double-bagged: 5. Amended water used Yes No 8. Glovebags vacuumed, 7. Open/damaged ends of insul. sealed: Form NY Continued on Back

NYC-WTC 000129502

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000129502Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →