NYC 9/11 Public Portal Document
Part 1
ITOR LOG
TC PROJECT
4 P ie k: 5. Work Area(s):
I. ent: 4a. Task #:
3. Prcyegt e 1 ~~'b` Date:
8. ATC Representative,
7. Contractor's Foreman
ontractor:
/ fn
Glovebagging Other _-
Tent-Containment
Full-Containment lin. ft.)
Type of Project: ___ Small (< 160 sq. ft.. 260
260 tin. ft. of ACM)
Large (> 160 sq. ft., Cleaning
Size of Project: Removal
Prep
Pre-abatement Sampling
Phase of Abatement: Finals
Waste Load-out
Encapsulation
ABATEMENT
FULL-CONTAINMENT
room, section):
Work Area Location (floor, N/A (If already completed)
Yes (Indicate prep work performed in 1 - 10) Yes No
Preparation of Work Area:
No 2. Ceiling Poly: No
Yes Yes
1. Construction of Decon: No 4. Wall Poly: No
Yes Yes
3. Critical Barriers (CBs): No 6. Floor Poly Yes No
Yes _
5. Removal to establish CBs: No 8. Pre-cleaning: No
Yes Yes
7. Negative air: No 10. Temporary Power: No (Explain why)
Yes Passes: Yes --
9. Prep work completed: No 12. Prep-Inspection
Yes
11. Other
N/A
Yes (Complete I - 5) Ceiling Tile
Removal: Fireproofing
LI
Duct Insulation _ Other:
Pipe Insulation Transite Boards
Floor Tile
1. Type of ACM:
- Boiler Insulation Yes No
Yes No 3. Amended water used during removal: Yes No
0.02 in. of water: ---
2. Negative air pressure ≥ Yes No 5. Proper Decon procedures followed:
N/A
shift's duration:
4. Critical barriers intact for
Yes (Complete 1 - 6 )
Cleaning: after 1st cleaning:
2. 12/12-hour waiting period Yes N'
3rd Stage
1, 1st Stage _ 2nd Stage Yes No 4. 4/12-hour waiting period after 2nd cleaning:
cleaning:
3. Removal of 1st poly layer after 1st cleaning:- Yes No 6. 1/12-hour waiting period after 3rd cleaning: Yes N
5. Removal of 2nd poly layer after 2nd
ABATEMENT
TENT-CONTAINMENT
(floor, room, section):
Work Area Location N/A (it already completed)
Yes (Indicate prep work performed in 1 .6)
Preparation of Work Area:
Yes No
2. Pre-cleaning: _ No N/A
Yes No Yes
1. Construction of Tent: No 4. Negative Air:
Yes No
Decors Yes passes:
3. Construction of 6. Pref-inspection
completed: Yes No
5. Prep work
Ceiling Tile
Fireproofing
Remova1•. Duct Insulation Other: ~
Pipe Insulation Transite Boards Floor Tile
1. Type of ACM: Boiler Insulation Glovebag removal within tent (check 3 through
Gross removal within tent
• 2 Method or
Removal:
(If Glovebag Removal Check 3 through 8)
3. Glovebags smoke-tested:
Yes
Yes
No
No
4. Glovebags attached to smooth surface:
6. Removal included cleaning and encapsulation:
Yes
Yes
Yes
No
Nc
Nc
double-bagged:
5. Amended water used Yes No 8. Glovebags vacuumed,
7. Open/damaged ends of insul. sealed: Form NY
Continued on Back
NYC-WTC 000129502
OCR can misread numbers and units. Confirm readings against the page image before using them.