Volume 1 of the final documentation report for the WTC unoccupied building monitoring program at 125 Cedar Street.

NYC-WTC_000129376–000129386
Page image
Scanned page image, NYC-WTC_000129385
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Final Report 125 Cedar Street, NYC,NY

• non-detect congeners were reported at 50% of the analytical sensitivity, thereby yielding a more conservative recalculated TER

Mercury This analytical method is a cold-vapor atomic absorption method and is based on the absorption of radiation at the 253.7-nm wavelength by mercury vapor. The mercury is reduced to the elemental state and aerated from solution in a closed system. The mercury vapor passes through a cell positioned in the light path of an atomic absorption spectrophotometer. Absorbance (peak height) is measured as a function of mercury concentration.

WIPESAMPLINGRESULTS

The clearance wipe criteria for each of the following analytes were achieved in accordance with project specifications.

• Lead in settled dust, <25µg/ft2 • PAHs in settled dust, <0.3 mg/m2 • Dioxin in settled dust, <4ng/m2 • • Mercury, between 1 and 2 mg/m2

The attached appendices contain all laboratory analysis information.

CONCLUSIONS

Based on project oversight, including results of air sampling and wipe sampling data collected, it is the professional opinion of ATC that all cleaning at 125 Cedar Street, New York, New York was conducted in accordance with the project manual as well as all applicable federal, state and local asbestos regulations. All ambient and final air clearance and wipe sample results were found to have a concentration satisfactory to achieve the acceptable criteria established by the NYCDEP and USEPA standards for re- occupancy following cleaning activities. Cleaning of the areas was deemed acceptable upon achieving NYCDEP and USEPA defined primary clearance levels. The primary clearance levels for this project were defined as:

• Dioxin in settled dust, <4ng/m2 • Lead in settled dust, <25µg/ft • Asbestos in air, 0.0009 f/cc PCMe

In addition to the primary clearance levels, secondary clearance levels were utilized to • determine the need of additional cleaning. However, secondary clearance level analytical results did not warrant such additional cleaning.

ATC Project No. 15.22906.0002 Page 8

NYC-WTC 000129385

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000129385Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →