NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 51/100 CHURCH ST 1001409, 125/20
Document / 31 pages

Cover letter from Management Corp, 100 Church Street, Oct 2002

Machine-extracted title · confidence 95%

Letter dated October 4, 2002 from Management Corp enclosing executed asbestos permit applications for 100 Church Street.

NYC-WTC_000126787–000126817

Folder label: “100 CHURCH ST 1001409, 125/20

Page image
Scanned page image, NYC-WTC_000126802
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document 718 595 564b r • +• SEP-13-2002 15:39 NYCDEP BANFM ASB, LEAD TRU

. Fupding Facade Clean-up

contractor with NYCA and NYSDOL licensed asbestos Work shall be performed by a NYSDOL asbestos certified workers. facades• cleaning should be experienced in cleaning building The contractor performing the shall DEP.'The area below the façade cleaningACM specified ("specified ~") by . The ole red area shall be i sh a g. All debris must be collected fa as eled be covered with a layer of th ysurface di yleas must be double bagged m ACM waste labhall (i.e. All waste directly upon removal from the noff on the (' building façade is not permitted. ru bags.) Riming water or water below the façade Access to the wind ed W w ith not be aperformed during Building occupants shall be notifi caution t~ Cleaning shall matted cleaning shall be restricted and speeds greater than 20 mph• during the MI windows shall be closedduct tape to tioners shall be turned otl with All ng systems and ~ require cleaning of the building. air conditioners and windows prevent water penetration. must be clean-up activities on the roof cas- - where equipment is ri sad from theor of All roof completed prior to egging equipment from the wetting windows on the facade shall be cleaned of large bulk material by wiping All horizontal surfaces and all non-metallic scrapers, by wet non-metallic bristle brushes or and hand brushing or scraping with v, andlow- low shall be used for wet wipingprohibited. top to bottom. Only and/ or by HEPA vacuuming f any other chemical cleaning agents are pressure washing. Detergents, solvents, additives, and placed into containers (e.g. bags). Windows shall be wet The removed material shall be immediately this procedure. Power for HEM vacuums shall be wiped. Free running water shall not be evident during supplied through ground fault interrupters. specified area shall be carefullywater washed. A low pressure washing bounce-back. Facades shall After completion of debris re>o employed to minimize bottom, shall be technique, moving from top not to exceed 250 psi. be washed with a low-pressure wash shall be performed to completion of work, a visual inspection of the abated surfaces and sidewalk At the verify the absence of visible debris. monitoring firm performed by an dependent NYSDOL licensed third party air Air monitoring shall be with certified workers. this work disruption to the public and to the building occupants, it is recommended In order to minimize be performed during off-hours.

Page 5 05/03/02

NYC-WTC 000126802

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000126802Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →