NYC 9/11 Public Portal Document
NOV.13.2002 4:24PM ROSS & HARDIES NO.979 P.13
Fulldlaag Facade Clean-np
Work shall be performed by a NYSDOL licensed asbestos contractor with NY'CDEP and NYSDOL
asbestos certified workers.
The contractor performing the cleaning should be experienced in cleaning building facades.
The clean up area shall be specified (''specified area") by f)EP. The area below the facade cleaning shall
be covered with a layer of polyethylene sheeting. -A11 debris must be collected for disposal as ACM
directly upon removal ironythe surface. (i.e.,All waste must be double bagged in ACM waste labeled
bags.) Running water or water runoffon the building facade is not permitted.
Building occupants shall be notified prior to the façade cleaning. Access to the street below the facade
cleaning shall be resstricted and marked with caution tape. Cleaning shall not be performed during wind
speeds greater than 20 mph.
All HVAC systems and air conditioners shall be tarredoff All windows shall be closed during the
cleaning of the building. Some air conditioners and ';windows may require sealing with duct tape to
pre=vent water penetration.
. tle.xoof: All cleanup activities on the roof must be
completed prior to rigging equipmentfrom the root
All horizontal surfaces,and allwindows on the facade shellbe cleaned oflarge bad;, material by wetting
and hand brushing or scraping with non melal is bustle braes or nonnrnetallic scrapers, by wet wiping
and/ or by BEPA vacuuming from top . to bottom.:Only water shall be used for wet wiping and low.
pressure washing. Detergents, solvents, additives,' and any other chemical cleaning agents are prohibited.
The removed material shall be immediately placed into containers (e.g. bags).' Window& shall be wet
wiped Free running water shall not be evident during fts procedure. Power for HEPA vacuums shall be
supplied through ground fault interrupters.
After completion of debris removal, the specified area shall be carefftlly washed. 'A low pressure washing
technique, moving from top to bottom, shall be •employed to minimize water boutce-back. Facades shall
be washed with a low-pressure wash not to exceed 250 psi.
At the eomplotion of work, a visual inspection:of the abated surfaces and sidewalk shall be performed to
verify the absence of visible debris.
Air monitoring shall be performed by as independentz NYSDOL licensed third party air monitoring ffnm
with certified workers. ,
In order ;to minimize disruption to the public and to. tbo building occupants, it is recommended this work
be performed during off-hours. .
Page S
05/03/02
NYC-WTC 000115612
OCR can misread numbers and units. Confirm readings against the page image before using them.