Fulidh ag Facade
Clean-up
Work shall be performed by a NYSDOL licensed asbestos contractor with NY'CDBP and NYSDOL
asbestos certified workers.
The contractor performing the cleaning should be experienced in cleaning building facades.
The clean up area shall be specified (''specified area") by X)EP,7be area below the facade cleaning shall
be covered with a layer of polyethylene sheeting.,Al1 debris must be collected for disposal as ACM
directly upon removal from dw surface. (i.e.,All waste must be double bagged in ACM waste labeled
bags.) Rimming water or water runoffon the building facade is not permitted.
Building occupants shall be notified prior to the cleaning. Access to the succt below the facade facade
cleaning shall be restricted and marked with caution tape. Cleaning shall not be performed during wind
speeds &eatesr than 20 mph.
All HVAC systems and air conditioners be tt led off''. All windows shall be closed during the shall
r
cleaning of the building. Some air conditioners 'windows may require sealing with duct tape to and
prevent water penetration.
.pzzaULri2 Iñ'on tlexoof All rleaa up activities on the roof must be
completed prior to rigging equipmenttom the roof,
All horizontal surfaces,and windows on the: facade be cleaned oflarge bull;,material by wetting all
shall
and hand brushing or scraping with non naelal is brushes or nonnmetallic scrapers, by wet wiping bustle
and/ or by BEPA vuuuming from top.to .bottom.:.Cn1y water shall be used for wet wiping and low.
pressure washing. Detergents, solvents, additives,'atad nay other chemical cleaning mats are prohibited.
The removed material shall be imrtiediateiy placed into`'comtaaness (e.g. bags).' Windows shall be wet
wiped Free running water shall not be evident.during this procedure. Power for HE?A vacuums shall be
supplied through fault interrupters. ground
After completion ofdebris removal, the specified area
shall be carefftlly washed.'A low pressure washing
technique, moving from to bottom,shall be• to p
employed
to minimize water bounce-back. Facades shall
be washed with a low-pressure wash not to e3ceeed 250 psi.
At the eompletion of work, a visual
inspection :ofthe abated surfaces and sidewalk shall be performed to
verify
the absence
of
S
debris.
visible
Air
monitoring
shall
be
performed
by as
third
independenn NYSDOL
licensed
party
air
ne
fi
monitoring
with
certified
workers.
In
;to
order
minimize
to
disruption
the
public and to.
building
th occupants,
rescomn
it e
is
e
nded this
work
be
performed
during otT-borers. .
Page S
0$/03/02
NYC-WTC 000115612