NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 34/83 NASSAU STREET 1001213, 79/3
Document / 17 pages

DEP Final Notice Regarding WTC Debris Cleanup, 83 Nassau Street,

Machine-extracted title · confidence 90%

Final notice urging building owner to participate in city debris cleanup program for exterior surfaces.

NYC-WTC_000100652–000100668

Folder label: “83 NASSAU STREET 1001213, 79/3

Page image
Scanned page image, NYC-WTC_000100667
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

FILE No.132 09/05 '02 16:45 ID: FAX: PAGE 16

Building Facade Clean-up

Work shall be performed by a NYSI)O1. licensed asbestos contractor with NYC1)LiP and NYSI)OL ushestos certified workers.

The contractor performing the cleaning should be experienced in cleaning building facades.

The clean up area shall he specified ("specified urea") by DEP. The area below the facade cleaning shall he covered with a layer of polyethylene sheeting. All debris must he collected for disposal as ACM directly upon removal from the surtitce. (i.e. All waste must he double bagged in ACM waste labeled bags.) Running water or water runoff on the building facade is not permitted.

Building occupants shall he notified prior to the facade cleaning. Access to the street below the facade cleaning shall he restricted and marked with caution tape. ('leaning shall not he perlomted during wind speeds greater than 20 mph.

All llVAC systems and air conditioners shall he turned off. All windows shall he closed during the cleaning of the building. Some air conditioners and windows may require sealing with duct tape In prevent water penetration.

In cases where equipment„,is,ri ed f om the fyoS All clean-up activities on the roof must be completed prior to ri equipment from the roof. gging

All horizontal surfaces and all windows on the facade shall be cleaned of large bulk material by wetting and hand brushing or scraping with non-mel:ullic bristle brushes or non-metallic scrapers, by wet wiping and/ or by HLWA vacuuming from top to bottom. Only water shall be used for wet wiping and low- pressure washing. Detergents, solvents, additives, and any other chemical cleaning agents are prohibited. the removed material shall he immediately placed into containers (e.g. bags). Windows shall he wet wiped. Free running water shall not. be evident during this procedure. Power for HF:PA vacuums shall be supplied through ground mull. interrupters.

Alter completion of debris removal, the specified area shall be carefully washed. A low pressure washing technique, moving from top to bottom, shall be employed to minimize water bounce-back. t'acades shall he washed with a low-pressure wash not to exceed 250 psi.

At the completion of work, a visual inspection of I.he abated surfaces and sidewalk shall he performed to verify the absence of visible debris.

Air monitoring shall he performed by an independent.. NYSDOL licensed third party air monitoring Linn with certified workers.

In order to minimize disruption to the public and to the building occupants, it is recommended this work be performed during off-hours.

Page 5 05/(13/1)2

NYC-WTC 000100667

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000100667Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000100669 · Box DEP Box 34

Form recording inspection results for facade and setback debris, including ACM presence and air monitoring at 83 Nassau Street.

Filed in the same folder

Compare copies and versions →