Asbestos abatement technical specifications, 130 Cedar Street, July 2004

Machine-extracted title · confidence 100%

Technical specifications document prepared for asbestos abatement work at the 130 Cedar Street site.

NYC-WTC_000125579–000125652

Folder label: “130 CEDAR STREET

Page image
Scanned page image, NYC-WTC_000125643
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document LOCATION FLOOR Basement Basement Roof Ground Floor 2° Floor 3 Floor 4° Floor 5° Floor 6* Floor 7ª Floor 8" Floor 9° Floor 10" Floor 11" Floor 12" Floor Ground Floor 10th Floor 11th Floor 12th Floor AREA Elevator Shaits Electrical Room Elevator Bulkhead Exterior Façade = = = = Exterior Facade AСM TYPE Elevator Break Pads Electrical Panel Board Electrical Panel Board Window Lintel Caulking LAB RESULTS Assumed ACM Assumed ACM Assumea ACM Confirmed ACM = Old Window Frame Caulk Steel Casement Windows = = = = Confirmed ACM = = = AGM QUANTITY 120 SF 1,000 SF 500 SF 17 MO/ 400 LF 17 MOI 400 LF 17 MOI 400 LF 17 MOI 400 LF 17 MOI 400 LF 17 MO/ 400 LF 17 MOI 400 LF 17 MOI 400 LF 29 MO/ 720 LF 28 MO/ 720 LF 28 MOI 720 LF 30 MOI 750 LF 8 MO/ 360 LF 8 MO/ 360 LF 8 MO/ 360 LF 8 MO/ 360 LF 8 MO/ 360 LF 8 MO/ 360 LF 8 MO/ 360 LF 8 MO/ 360 LF 14 MO/ 510 LF 13 MO/ 500 LF 14 MO/ 510 LF 15 MO/ 460 LF Asbestos Abatement Technical Specifications For 130 Cedar Street, New York, NY NOTES Assumed ACM Assumed ACM Machine Room Confirmed ACM at all inteis - please refer to Attachment for actual dimension and number of window bays Confirmed ACM under Aluminum Frames at North and South Elevations - please refer to Attachment B for actual dimensions and number of window bays Propared by JLC Environmental Consultants, Inc. Project No. 04-3271 Page 65 NYC-WTC 000125643

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000125643Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000127738 · Box DEP Box 52

Health and safety plan for Phase I deconstruction at 133-135 Greenwich Street and 21-23 Thames Street dated June 8, 2005.

Cited alongside this record in an Ask answer

Compare copies and versions →