Asbestos abatement technical specifications, 130 Cedar Street, July 2004

Machine-extracted title · confidence 100%

Technical specifications document prepared for asbestos abatement work at the 130 Cedar Street site.

NYC-WTC_000125579–000125652

Folder label: “130 CEDAR STREET

Page image
Scanned page image, NYC-WTC_000125642
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document LOCATION FLOOR 7t Floor Main Roof Bulkheads Water Tower Bulkhead Roof Elevator Machine Room Fan Room Tank Room AREA Entire Entire Entire Entire Roof Bulkhead Exterior Elevations Entire Roof Bulkhead Roof Bulkhead Roof Under Water Tower Roof ACN TYPE Wall Plaster White Coat Wall Plaster Brown Coat Skim Coat Plaster on Columns Roof Membrane Top Perimeter Flashing Tar Tar Paper Over Ply Wood Bulkhead Exterior Door Caulking Bulkhead Flashing Tar Exterior Window Caulking Bulkhead Tar Roofing Membrane Perimeter Flashing Pitch Pocket Tar Perimeter Flashing & Pitch Pocket Roof Membrane Perimeter Flashing Corrugated Insulation 2" O.D. Pipe Pipe Fitting Insulation to 2" O.D. Pipe LAB RESULTS ACM ACM ACM ACM ACM ACM ACM ACM ACM ACM ACM ACM ACM ACM ACM ACM ACM ACM Asbestos Abatement Technical Specifications For 130 Cedar Streot, New York, NY AСM QUANTITY 5,000 SF 2,500 SF 4,500 SF 1,200 SF 684 SF 80 LF/ 6 Doors 200 SF 220 LF 6,000 SF 800 SF 120 SF 20 SF 150 SF 100 SF 50 SF 150 LF 20 SF NOTES Wall plaster was contirmed ACM at 7t Floor Confirmed ACM At Main Roof Confirmed ACM At Bulkheads Confirmed ACM at Water Tower Bulkhead Confirmed ACM Confirmed ACM- poor condition Prepared by JLC Environmental Consultants, Inc. Project No. 04-3271 Page 64 NYC-WT 000125642

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000125642Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000127738 · Box DEP Box 52

Health and safety plan for Phase I deconstruction at 133-135 Greenwich Street and 21-23 Thames Street dated June 8, 2005.

Cited alongside this record in an Ask answer

Compare copies and versions →