NYC 9/11 Public Portal Document
LOCATION
FLOOR
7t Floor
Main Roof
Bulkheads
Water
Tower
Bulkhead
Roof
Elevator
Machine
Room
Fan Room
Tank Room
AREA
Entire
Entire
Entire
Entire Roof
Bulkhead
Exterior
Elevations
Entire
Roof
Bulkhead Roof
Bulkhead Roof
Under Water
Tower Roof
ACN TYPE
Wall Plaster White Coat
Wall Plaster Brown Coat
Skim Coat Plaster on Columns
Roof Membrane Top
Perimeter Flashing Tar
Tar Paper Over Ply Wood
Bulkhead Exterior Door Caulking
Bulkhead Flashing Tar
Exterior Window Caulking
Bulkhead Tar
Roofing Membrane
Perimeter Flashing
Pitch Pocket Tar
Perimeter Flashing & Pitch Pocket
Roof Membrane
Perimeter Flashing
Corrugated Insulation 2" O.D. Pipe
Pipe Fitting Insulation to 2" O.D. Pipe
LAB RESULTS
ACM
ACM
ACM
ACM
ACM
ACM
ACM
ACM
ACM
ACM
ACM
ACM
ACM
ACM
ACM
ACM
ACM
ACM
Asbestos Abatement Technical Specifications
For 130 Cedar Streot, New York, NY
AСM QUANTITY
5,000 SF
2,500 SF
4,500 SF
1,200 SF
684 SF
80 LF/ 6 Doors
200 SF
220 LF
6,000 SF
800 SF
120 SF
20 SF
150 SF
100 SF
50 SF
150 LF
20 SF
NOTES
Wall plaster was
contirmed ACM at
7t Floor
Confirmed ACM
At Main Roof
Confirmed ACM
At Bulkheads
Confirmed ACM at
Water Tower
Bulkhead
Confirmed ACM
Confirmed ACM-
poor condition
Prepared by JLC Environmental Consultants, Inc. Project No. 04-3271 Page 64