Asbestos abatement technical specifications, 130 Cedar Street, July 2004

Machine-extracted title · confidence 100%

Technical specifications document prepared for asbestos abatement work at the 130 Cedar Street site.

NYC-WTC_000125579–000125652

Folder label: “130 CEDAR STREET

Page image
Scanned page image, NYC-WTC_000125644
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document Asbestos Abatement Technical Specifications For 130 Cedar Street, New York, NY Ground Floor Exterior Fagade Exterior Caulking Confirmed ACM_| 9 MO/ 330 LF Confirmed ACM at all 2™ Floor i a “ * ‘ * | 9MO/330LF old factory windows — 3° Floor “ a “ “ . 9 MO/ 330 LF please refer to 4” Floor “ “ é . * . 9 MO/ 330 LF Attachment B for actual 5" Floor “ “ . “ “ * 9 MO/ 330 LF dimensions and 6" Fioor “ “ “ 5 “ “| 9MO/330LF number of window 7* Floor a ‘ “ : “s “| 9MO/ 330 LF bays 8" Floor “ : Z “ “ “| 9MO/330 LF 9" Floor “ “ a “ “| 15 MO/ 800 LF 10" Floor a “ “ “ ' * _| 15 MO/ 750 LF 11" Floor ; a = “ 5 “| 44 MO/ 766 LF 12" Floor : “ : “ “ “| 15 MO/ 800 LF Ground Floor Exterior Facade Exterior/Interior Putty Confirmed ACM _ | 9 MO/ 2,250 LF Confirmed ACM at all | 2" Floor m “ a “ “| 9 MO/ 2,250 LF old factory windows — 3% Floor a ‘ “ “ . * 9 MO/ 2,250 LF please refer to 4" Floor “ 5 . “ “ “ _{9MO/ 2,250 LF Attachment B for 5" Floor * “ “ “ “ * __| 9 MO/ 2,250 LF dimensions and 6" Floor ; “ # ‘ “ “| 9MO/2,250 LF number of window. 7" Floor “ “ “ “ “| 9 MO/ 2,250 LF bays 8" Floor “ 5 “ “ ‘ “| 9MO/ 2,250 LF 9" Floor i. a “ “ “ ® 15 MO/ 4,050 LF 10™ Floor “ “ ‘ “| 15 MO/3,750 LF 11™ Floor : . “ @ 3 “| 14MO/3,750 LF 12" Floor “ “ i “ 5 “| 45 MO/ 4,050 LF Prepared by JLC Environmental Consultants, Inc. Project No. 04-3271 Page 66 NYC-WTC_000125644

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000125644Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000127738 · Box DEP Box 52

Health and safety plan for Phase I deconstruction at 133-135 Greenwich Street and 21-23 Thames Street dated June 8, 2005.

Cited alongside this record in an Ask answer

Compare copies and versions →