Contractor requirements and site plan notes for demolition work at 30 Cedar Street.
1 shared non-person entities · Same agency, volume and box · similarity 0.943
machine-extracted · confidence unavailable · Check page ↗Protocol document outlining air sampling and monitoring procedures for 130 Cedar Street.
NYC-WTC_000125098–000125202Folder label: “130 CEDAR STREET”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
130 Cedar Street July 15, 2004 Selective Demolition and Façade Restoration Koenen Associates
b. Remove laitance by grinding or mechanical abrading. c. Remove loose particles present or resulting from grinding, abrading , or blast cleaning by blowing out joints with compressed air, oil and water •
free, or vacuuming joints prior to application of primer or sealant. 3. Clean non-porous surfaces such as metal and glass chemically. Remove protective coatings on metallic surfaces by solvent that leaves no residue and is compatible with sealant. Use solvent with clean, lint free paper towels, and wipe dry with clean, dry lint free paper towels. Do not allow solvent to air dry without wiping. Clean joint areas protected with masking tape or strippable films as above after removal of tape film. 4. Joint Size and Sealant Size: Joints to receive sealant shall be at least 1/4" wide. In joints 1/4" to 3/8" wide, sealant shall be 114" deep. In joints wider than 3/8" and up to 1" wide, sealant depth shall be one half the joint width. For joints wider than 1" sealant depth shall be as recommended by the sealant manufacturer. Depth of joint Is defined as distance from outside face of joint to closest point of the filler. 5. Primer Thoroughly clean joints and apply primer to all surfaces that will receive sealant. Apply primer on clean, dry surfaces, and prior to Installation of joint backing. Completely wet both Inner faces of the joint with primer. Mask adjacent surfaces of joint with non-staining masking tape prior to priming. 6. Joint Backing: In joints where depth of joint exceeds required depth of sealant, install Joint backing (after primer Is dry) In joints to provide backing and proper joint shape for sealant. Proper shape for sealant Is a very slight "hourglass" shape, with back and front face having slight concave curvature. Use special blunt T- shaped tool or roller to Install joint backing to the proper and uniform depth required for the sealant. Joint backing shall be Installed with approximately twenty-five (25) percent compression. Do not stretch, twist, braid, puncture, or tear joint backing. Butt joint backing at intersections. 7. Bond Breaker. Install bond breaker smoothly over joint backing so that sealant .. adheres only to the sides of the joint and not backing. 8. Sealant Application: Apply sealant In accordance with the manufacturer's application manual and manufacturer's instructions, using hand guns or pressure equipment, on clean, dry, properly prepared substrates, completely filling joints to eliminate air pockets and voids. Mask adjacent surfaces of joint with non-staining masking tape. Force sealant into joint in front of the tip of the "caulking gun" (not pulled after It) and force sealant against sides to make uniform contact with sides of joint and to prevent entrapped air or pulling of sealant off of sides. Fill sealant space solid with sealant. 9. Tooling: Tool exposed joints to form smooth and uniform beds, with slightly concave surface. Finished joints shall be straight, uniform, smooth and neatly finished. Removed masking tape Immediately after tooling of sealant and before sealant face starts to "skin" over. Neatly remove any excess sealant from adjacent surfaces of joint, leaving the work in a neat, clean condition. 10. Replace any sealant which is damaged during construction process. 11. No prepared joint or crack shall be left unsealed at the completion of each day's work.
END OF SECTION
Joint Sealers 07900-3
NYC-WTC 000125202
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000125070
Contractor requirements and site plan notes for demolition work at 30 Cedar Street.
1 shared non-person entities · Same agency, volume and box · similarity 0.943
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164903
Forwarded programmatic agreement documentation addressing post-disaster building cleaning procedures and eligible building list for recovery efforts.
7 shared non-person entities · 1 shared topics · similarity 0.952
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000093788
Fax transmittal from the Mayor's Office regarding a March 2002 meeting with the building group.
8 shared non-person entities · similarity 0.948
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000150931
Cover fax from the Mayor's Office forwarding DEP documents regarding exterior clean-up to be reviewed before a meeting with building owners.
7 shared non-person entities · similarity 0.946
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165271
Engineering drawings and specifications for replacing a high-pressure water line under the Lincoln Tunnel contract.
1 shared non-person entities · similarity 0.938
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000098577
Contract specifications outlining site decontamination and asbestos disposal procedures for 53 Park Place.
13 shared non-person entities · 1 shared topics · similarity 0.936
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000112207
Letter submitting a signed permit application for exterior cleaning at 14 Wall Street to the NYC DEP.
8 shared non-person entities · similarity 0.935
machine-extracted · confidence unavailable · Check page ↗8 shared non-person entities · similarity 0.935
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000115561
Attorney letter regarding legal proceedings between environmental protection authorities and property owners at 29 Park Row.
8 shared non-person entities · similarity 0.934
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000098612
Contract specifications outlining site decontamination and asbestos disposal procedures for 110 Church Street.
13 shared non-person entities · similarity 0.934
machine-extracted · confidence unavailable · Check page ↗8 shared non-person entities · similarity 0.934
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000113500
Legal agreement between NYC DEP and the building owner authorizing city-funded removal of foreign material.
8 shared non-person entities · similarity 0.933
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000171237
Document listing punch items and contacts for the Mayor's Office of Emergency Management at 7 World Trade Center.
Similarity score 0.918 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000124241
Letter from ATC Associates regarding confirmatory asbestos bulk sampling conducted on the roofs of 99 Church Street.
Similarity score 0.906 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000125070
Contractor requirements and site plan notes for demolition work at 30 Cedar Street.
Similarity score 0.905 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.904 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000125698
Correspondence regarding DEP acceptance of a variance package for asbestos removal at 130 Cedar Street.
Similarity score 0.904 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155460
Submission of a preliminary scope of work document for safely cleaning the 114 Liberty Street building.
Similarity score 0.903 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000125204
Cover page for a survey report detailing asbestos and lead-based paint findings at 130 Cedar Street.
Cited alongside this record in an Ask answer
NYC-WTC_000125579
Technical specifications document prepared for asbestos abatement work at the 130 Cedar Street site.
Cited alongside this record in an Ask answer
NYC-WTC_000159285
Official letter confirming substantial completion of work under Contract REG-024D subject to outstanding punch list items.
Cited alongside this record in an Ask answer
NYC-WTC_000167029
Draft lease document outlining premises and terms for the Mayor's Office of Emergency Management at 7 World Trade Center.
Cited alongside this record in an Ask answer
Lease provision defining the landlord's ownership warranty and requirements for final layout and finish plans at 7 World Trade Center.
Cited alongside this record in an Ask answer