NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 50/130 CEDAR STREET
Document / 22 pages

Asbestos permit application correspondence, 130 Cedar Street, Feb 2005

Machine-extracted title · confidence 100%

Correspondence submitting updated asbestos project documentation to the DEP for 130 Cedar Street.

NYC-WTC_000125076–000125097

Folder label: “130 CEDAR STREET

Page image
Scanned page image, NYC-WTC_000125081
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

NYC DEP ACP Fax:7185953648 Feb 28 2005 17:06 P.06

FOR OFFICIAL, USE ONLY NYC DEPARTMENT OF ENVIRONME~ Asbestos Control P r i N variancest_ ~~ 'I ' 59-17 Junction Boulevard, 8'" Floor, Corona, NY 11368-5107 D' Fee Paid 21-6 U2/ ON TYPEWRITTEN l ~ Asbestos Variance Application FORMS WILL BE ~. .•L ! 0- Notification # ACCEPTED o~teaC

I. FACILITY Address 130 Cedar Street /1/4 ! dj ( Application must be . Borough Manhattan Zi p 10607 made at least 2 weeks prior to the II. APPLICANT start of work. Name East Coast Haz Mat Removal, Inc. Tel # (973) 345.0022 Address 494 E. 41 Street Cl ), Paterson State NJ Zip 07504

Capacity: 0 Contractor ❑ Consultant ❑ owner D Other Contact Person Leszek Olszewski Ill. SPECIFY ALL NYC DEP OR NYS DOL (ICR56) ASBESTOS RULE PROVISIONS FROM WHICH A VA IA CJESgEO 1 ,

SPECIFY FLOORS ANDIOR AREAS WHERE WORK INVOLVING THIS VARIANCE IS TO OCCI '8 LI

REASONS FOR REQUEST AND DESCRIPTION FOR PROPOSED ACTION (Attachment(s) shall ubm in TRIP T.EI Explain why the procedures required by Title 15, Chapter 1 of the Rules of the City of New York (RCN f3T 12 of New York Codes, Rules and Regulations (Subparts 56-4 through 56-17) cannot be used. (Attach Additions , , .- State the alternative procedures that will be employed to satisfy each requirement as modified. (Attach Additional Sheets) Provide color coded drawings identifying work area(s) and location of decontamination enclosure system(s). IV. FEE SCHEDULE

Amount of ACM affected by this variance: 58'751 square feet t 1,700 linear feat c Total Amount of ACM 80,451 feet If total amount of ACM If total amount of ACM Is less than 5000 feet: Is 5000 feet or more: Seven day notification period waiver $300 $400 See Section 1-03(e) First sub-section (per category) $400 $600 of the NYCDEP Each a ditional sub-section (per ca o $200 $300 Asbestos Rules for Maximum fee $1200 $1800 category definitions.

Enter applicable fee based on schedule above Total Fees S $1,800 V. I hereby declare that the information provided herein and in any and all accompanying attachments is true and complete to the best of my knowledge. I understand that failure to comply with conditions set forth by the Department in an approval of the application shall render this variance null and void.

Cedar & WashingtonStreet Association East Coast -laz.Mat Rert,>tov~. in Name of Owner Print N ' e o pli t (If of ' ner)

12/22/04 12/22/04 Date S r of Applicant Date Work'4rfvolving a variance may not commence prior to the receipt of the Department's approval of the application. Any violation of the terms of any variance issued pursuant to Tide 16, Chapter 1 of the RCNY Section 1-03 is considered a violation of the lettered subdivision modified by the variance. acne 1

NYC-WTC 000125081

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000125081Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →