NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 49/211 BROADWAY
Document / 46 pages

WTC building inspection form, 211 Broadway

Machine-extracted title · confidence 90%

Form documenting building inspection findings including facade assessment and ACM presence for a property in the WTC area.

NYC-WTC_000123667–000123712

Folder label: “211 BROADWAY

Page image
Scanned page image, NYC-WTC_000123673
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

ILL TESTWELL" Microbial Abatement 55 Church Street New York, NY Page 1 LABORATORIES,1NG

WORK PROCEDURES

The following procedures shall be followed for the removal of the microbial contaminated drywall surfaces from tower floors 26 through 55 as identified on the attached drawings.

1. The Contractor shall be responsible for providing trained, experienced and qualified workers for this project.

2. Drawings identify locations where visible growth has been observed along with an estimated quantity of affected drywall surface

• 3. The Contractor shall abide by all health and safety requirements including NYC Department of Health Guidelines for fungi remediation. It is the responsibility of the Contractor to provide adequate Personal Protection Equipment (PPE) including protective clothing, respiratory protection in accordance with OSHA 1910.134, and decontamination facilities to the workers and inspectors involved in the microbial cleanup and sanitization.

• 4. Removal of affected drywall surfaces identified as affected shall be as follows:

a. Small Isolated Areas (30 sq. ft or less).

(1). One (1) layer of plastic sheeting shall be placed on the floor directly under the sheetrock to act as a drop cloth. •

(2). Materials to be removed shall be lightly misted with a disinfectant for dust suppression prior to removal

(3). The Sub-contractor must use a HEPA vacuum in conjunction with sheetrock cutting and removal. • (4). All contaminated absorbed wall and/or ceiling drywall shall be removed and placed in six mil plastic bag for disposal. Contractor shall remove sheetrock in the affected areas and an additional 2'-0' beyond the affected adjacent planar surface. Do not extend cutting into other significant structures (i.e chase to wall, • wall to chase, wall to ceiling, etc.)

(5). Where affected drywall includes a vertical chase enclosure containing mechanical systems, such mechanical systems shall be inspected for signs of visible growth and, if determined to be present, said insulation shall be removed.

• (6). All exposed metal studs shall be cleaned and sanitized after sheetrock removal.

(7). Do not disturb or otherwise undermine finished stone base, flooring, sinks, bathtubs, tile walls, ceilings, etc. If such items are adjacent to affected surfaces, remove as much drywall as possible and spray the remaining surfaces with disinfectant.

(8). Affected areas shall be allowed to thoroughly dry prior to-closing openings.

NYC-WTC 000123673

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000123673Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →