NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 49/180 BROADWAY 1001101, 65/18
Document / 15 pages

Asbestos abatement invoice, 180 Broadway, Aug 2002

Machine-extracted title · confidence 95%

Invoice for roof asbestos abatement work completed at 180 Broadway covering over 19,000 square feet.

NYC-WTC_000122823–000122837

Folder label: “180 BROADWAY 1001101, 65/18

Page image
Scanned page image, NYC-WTC_000122824
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Eo qcwTc • NYC DEPARTMENT O EI)MRONMENTAL PROTECTIOr Asbestos Control Program w f 59-17 Junction Boulevard, 8tI oor,Corona, NY 11368-5107 ONLY ~+~ FOROFFICInr USE ONLY ASBESTOS PROJECT NOTIFICATION www.n . ov de (ASBESTOS INSPECTION REPORT) 1. ___________

When submitting this form at the NYC Department of Buildings, the original form and three (3) copies with original signatures are required. Submittal at the NYCDEP requires one copy of the form with original signatures. This form must be submitted to the NYC DEP not less than one week In advance of the start of abatement activities. 1. FACILITY

2. Address 18 0 Broadway Borough Manhattan Zip AKA 3. Block 65 4. Lot 18 5. Type of Facility 6. Name of Building 11. BUILDING OWNER

7. Name Downtown Realty Operating Corp 8. Contact Person 9. Tel.# Fax#

10. Address Cfty State Zip III. GENERAL CONTRACTOR

11. Name Tel. # IV. ASBESTOS ABATEMENT CONTRACTOR

12. Name Benjamin Kurzban & Son Control 13. Contact Person Louie lannioo 14. Federal Employer ID. #_._._._._._.P.1~._._._._._. 15. Tel. # (718) 531-2900 Fax # (718) 209-1808 16. Address 1248 Ralph Avenue city Brooklyn State NY Zip 11236 THIRD PARTYAIR MONITOR

t. Name "` • 18. Contact Person 19. Federal Employer ID. # P1I _._._._._._. ___ 20. Tel. # (212) 922-0077 F # (212) 922-0630

21. Address 228 East 45th St city New York State NY Zip 10017 22. Sample Analysis Laboratory 23. NYS DOH ELAP # VI. PROJECT INFORMATION 1 24. Starting date for this portion of work _01 I i'2 62- Projected completion date _0 1. t2.W 2.

Asbestos work schedule 00 Monday I Tuesday ® Wednesday ® Thursday I Friday IS Saturday ® Sunday

Shift from: 8 0" ® am 0 pm to * ❑ am ®'pm If other, specify Access to Inspect the premises must be provided during the work schedule Indicated In this Item. t2 Zfl 25. Total amount of asbestos-containing material to be abated during this work ' r~•3id`26fi'.' ESTOSit. 1.9309 -1 Square Feet, and/or 0 Linear Feet TRUG ACP 7 212001

NYC-WTC 000122824

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000122824Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →