NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 49/114 CHAMBERS ST 1079161, 136/25
Document / 16 pages

Fiber Control Inc. invoice for 114 Chambers Street, July 2002

Machine-extracted title · confidence 100%

Invoice from Fiber Control Inc. dated July 2, 2002, regarding work at the 114 Chambers Street site.

NYC-WTC_000121806–000121821

Folder label: “114 CHAMBERS ST 1079161, 136/25

Page image
Scanned page image, NYC-WTC_000121816
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

• "'~° .. - v~F;T?FP?'.5 ?M`• `mR q?` ,'moire . . ~.~r 4 zrrrne y, ~

TOTAL FEET: 1500 0 NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION Basis of Inspection: _ ASBESTOS INSPECTION REPORT i TRU0954MN02 ONLY TYPEWRITTEN FEE EXEMPT: Yes APPLICATIONS WILL BE NOTE: ASBESTOS INSPECTION REPORT SHALL BE SUBMITTED I 1. $0.00 ACCEPTED TO NYC DEP NOT LESS THAN ONE WEEK IN ADVANCE ( Variance OF START OF THE WORK (ABATEMENT ACTIVITIES) START DATE: 6/29/02 PROJ. COMPLETION DATE: 8/31/02 1. FACILITY ADDRESS: 114 CHAMBERS STREET BORO: MANHATTAN ZIP: 10007 TYPE OFFACILITY: BLOCK: 136 LOT: 25 IL BUILDING OWNER NAME: SI JEI MEI INC Contact prince ma TEL. #: (212)267.1184 — ADDRESS: 61 bowery street CITY: ny STATE: ny ZIP: 10013 IV. ASBESTOS ABATEMENT CONTRACTOR NAME: FIBER CONTROL INC. ------------------- - TEL. #: (516) 781.3000 FEDERAL EMPLOYER IDENTIFICATION N: P11 ADDRESS: 3010 BURNS AVE - CITY: WANTAGH STATE: NY ZIP: 11793 VI. LABORATORY FOR SAMPLE ANALYSIS NAME: SCIENTIFIC LABORATORIES INC • NEW YORK CI NYS ELAP #: 11480 ASBESTOS WORK SCHEDULE DAY .J EVENING NIGHT .-WEEKENDS Li WEEKDAYS INSPECTOR NAME: - j c SQUAD #:I BADGE #: 4_cs Cc DATE OF INSPECTION: (t' / ~ Z cj /OL.TIME 0 INSPECTION: From: AM AM PM Contact at site: prince ma

Inspection disclosed that the following sections were complied with: (Check all that apply) 1.51 - Notifications, Reports, Pla 1.71 - Air Sampling and Monitorin 1-91 - Worker Protection 1.101 - Materials and Equipment 1-116 -Work Place Preparation 1.117 -Worker Decontamination System 1-118 - Waste Decontamination System 1-126 - Engineering Controls 1-127 - Entry/Exit Procedures 1.129 - Maintenance of Barriers 1.138 • Encapsulation 1-139 - Enclosure 1.140 - Glovebag 1.141 - Tent ! 1.137 - ACM Disturbance, RemoveL, Handling 1-146 - Preliminary Clean-up 1-147 - Final Clean-up Project not started . Inspection revealed all ACM to be intact. New start date: / / Project ongoing, expected completion date: / /

Project completed on or about / / . All surfaces, including abated surfaces are free of visible ACM and encapsulat Follow up necessary on / / Samples taken: No Yes 1 2 3 4 5 6 Photos taken: Yes No Additional comments: c —

Q— cAL

-- - RESULT CODE - ' BORO I = MANHATTAN 2 = BRONX 3 = BROOOKLYN 4 ` QUEENS 5 = STATEN ISLAND RESULT CODES 1 = VIOLATION ISSUED 2 = NO VIOLATION ISSUED 3 = NO ACCESS SUPERVISO I ITIALS 4 = PROJECT NOT STARTED (NO NOV) 5 = PROJECT COMPLETED (NO NOV)

NYC-WTC 000121816

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000121816Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000127307 · Box DEP Box 51

Invoice from Fiber Control, Inc. dated July 18, 2002, billing the DEP for work at job sites including 145 Chambers Street.

Similar indexed content

Compare copies and versions →