NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 48/88 PINE STREET Block: 38 Lot: 17 BIN: 1000876 153 Water St, 136-154 Front St, 138-144 Maiden Lane
Document / 3 pages

Air quality and dust analysis report, 88 Pine Street, Sept

Machine-extracted title · confidence 95%

Laboratory report detailing airborne asbestos fiber counts from multiple floors of 88 Pine Street following the September 11 attacks.

NYC-WTC_000120385–000120387

Folder label: “88 PINE STREET Block: 38 Lot: 17 BIN: 1000876 153 Water St, 136-154 Front St, 138-144 Maiden Lane

Page image
Scanned page image, NYC-WTC_000120386
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

All surfaces such as but not limited to the air-handling units, passenger and freight elevator lobbies, loading dock, main lobby, concourse level, roof top and cooling tower were wet wiped and HEPA vacuumed by a licensed asbestos contractor. All air filters within the said fan units were removed and disposed of as asbestos waste.

Please refer to the laboratory certificate of analysis for all samples collected.

In addition to the above, CTSI performed Indoor Air Quality testing from various areas of the building. The testing was performed for Particulate, Carbon Monoxide & Dioxide, Temperature & Relative Humidity. Temperature & Carbon Dioxide (CO2) levels were slightly elevated due to building shut down. Relative Humidity, Carbon Monoxide and Dust Particulate levels are within the OSHA standards.

CO2 is a colorless, odorless, tasteless gas that results from a combustion or metabolic process. Low CO2 concentration levels (which come from people) are always present in buildings. At concentrations above 5,000 PPM in air, a loss of mental acuity will occur. CO2 levels greater than 1,000 PPM indicate the lack of fresh air and poor ventilation or over occupation. Highly susceptible populations (i.e., elderly, asthmatic, immunodeficient) will experience some discomfort at levels of 800 PPM and greater. Typical office levels for CO2 are listed between 300 and 800 PPM. All levels collected on September 2511 ranged from 422 PPM to 706 PPM. Please refer to section VII.

The licensed asbestos contractor utilized for the project was Degmor, Inc. They have sent their documentation directly to your office.

Due to the outside air conditions with elevated dust levels and fumes from the clean up process, CTSI recommends that the outside fresh air louvers be kept closed and only opened when outside air has been checked by building engineering staff. Lack of fresh outside air will result in elevated Carbon Dioxide levels during building full occupancy after 10:00 AM. Tenants may report an increase in symptoms such as but not limited to headaches, mild dizziness and fatigue.

CTSI also, recommend the air filters on all fan units be inspected on a daily basis and if necessary, replaced during the outside clean up process. The cleaning contractor should only utilize HEPA filtered vacuums for building cleaning.

Furthermore, CTSI recommend periodic air quality monitoring during the outside clean up process.

Thank you for giving CTSI the opportunity to assist you on this project.

NYC-WTC 000120386

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000120386Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000154518 · Box DEP Box 26

Operational period plan from the FDNY detailing actions for December 21, 2001 at the World Trade Center site.

Cited alongside this record in an Ask answer

Compare copies and versions →