NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 47/50 BROAD STREET 1000820, 24/36
Document / 4 pages

50 BROAD STREET 1000820, 24/36

Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000118506–000118509
Page image
Scanned page image, NYC-WTC_000118508
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

NYC DEPARTMENT OF ENVIRONMEN ROTECTION i Asbestos Control Program 59-17 Junction Boulevard, 8' Floor. Corona, NY 11368-5107 J/e'

` RI7TEN DP)) ``,l ASBESTOS PROJECT NOTIFICATION Buading Dept. Or FOR OFFIGAL USE ONLY

7F RMS WILL BE`' 7rrrna —_ (ASBESTOS INSPECTION REPORT) ACCEPTED (---•.ra.c.• ~.r 1.

When submitting this form at the NYC Department of Buildings, the original form and three (3) copies with original signatures are required. Submittal at the NYCDEP requires one copy of the form with original signatures. This form must be submitted to the NYC DEP not less than one week in advance of the start of abatement activities.

1. FACILITY 50 Broad Street Borougtl"anhattan Zip10004 2. Address 24 36 AKA 3. Block 4. Lot

5. Type of Facility 6. Name of Building

II. BUILDING OWNER Inc. /50 New Str., Inc . 7. Name 50 Broad Str., Contact Person 9.Tel.# 212-425-1058 Fax #

10. Address City State Zip

Ill. GENERAL CONTRACTOR

11 Tel. #

IV. ASBESTOS ABATEMENT CONTRACTOR

12.Name Trio Asbestos Removal Corp. 13. Contact Person Chris Horan

14. Federal Employer ID. # i_._._._._._._.. ~._._._._._._. 15. Tel. # 71 8-961-4100 Fax # 71 8-961-4103 16.Address 14-20 129th Street citvCollege Point State NY Zip 11356

V. TH R^ f'^ t TY AIR MONITOR

17.Name Warren & Panzer Engineers, P.C. 18 Contact Person Michael Nolan

19. Federal Employer ID. # 20. Tel. # 212-922-0077 Fax# 212-922-0630 21.Address_228 East 45th Street city New York State NY Zip 10017 22. Sample Analysis Laboratory Warren & Panzer Engineers 23, NYS DOH ELAP # 1 1 251

VI. PROJECT INFORMATION ~ 24. Starting date for this portion of work ` Z Projected completion date I ~" 1foL

Asbestos work schedule ❑ Monday ❑ Tuesday ❑ Wednesday 0 Thursday ❑ Friday ❑ Saturday 0 Sunday

Shift from: _______Dam ❑pm to Dam ❑pm • If other. specify 7x7T Access to inspect the premises must be provided during the work schedule indicated in this item. 2 20 !hEj 25. Total amount of asbestos-containing material to be abated during this work _ BESTOSII.E~- ~, PROGRAM 55 , 620 Square Feet, and/or Linear Feet Tat G AGP7 7 2/2001

NYC-WTC 000118508

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000118508Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →