Invoice for roof cleanup, 50 Broad Street, Oct 2002

Machine-extracted title · confidence 95%

Invoice from Asbestos Removal Corp detailing costs for cleaning asphalt and gravel surfaces on the roof.

NYC-WTC_000118439–000118448

Folder label: “50 BROAD STREET 1000820, 24/36

Page image
Scanned page image, NYC-WTC_000118440
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

•, NYC DEPARTMENT OF ENVIRONMEN ROTECTION 17t Asbestos Control Program ' . r ®~` 59-17 Junction Boulevard, 8 Floor, Corona. NY 11368-5107 Buffing FIC(Aor No ~•. ~II FOR OFFICINL USEONLY ONLY ASBESTOS PROJECT NOTIFICATION RMlS EN \' 4 k"'~NrM:r"° f (ASBESTOS INSPECTION REPORT) 1 ACCEPTED ::o.la<a *..w..rc ( tee chedule)

When submitting this form at the NYC Department of Buildings, the original form and three (3) copies with original signatures are required. Submittal at the NYCDEP requires one copy of the form with original signatures. This form must be submitted to the NYC DEP not less than one week in advance of the start of abatement activities.

I. FACILITY 50 Broad Street BorougnManhattan Zip . 10004 2. Address _ 24 36 AKA 3- Block 4. Lot

5. Type of Facility___ ____ 6. Name of Building

II. BUILDING OWNER

7. Name 50 Broad Str., Inc. /50 New Str., Inc Contact Person 9. Tel. # 21 2-425-1 0S8 Fax#

10. Address City State Zip

Ill. GENERAL CONTRACTOR

11. Name Tel. #

IV. ASBESTOS ABATEMENT CONTRACTOR

12, Name Trio Asbestos Removal Corp. 13. Contact Person Chris Horan

14. Federal Employer ID. #L P -I! 15. Tel. # 718-961-4100 Fax# 718961-4103 16. Address 14` 20 129th Street w cit ollege Point _StateNY Zip 11356

V. THIRD PARTY AIR MONITOR

17. Name Warren & Panzer Engineers, P . C. 18. Contact Person Michael Nolan 19. Federal Employer ID. # 20. Tel. # 212-922-0077 Fax# 212-922-0630 21.Address 228 East 45th Street City New York State NY zip 10017

22. Sample Analysis Laboratory Warren & Panzer Engineers 23. NYS DOH ELAP # 11251

VI. PROJECT INFORMATION

24. Starting date for this portion of work ' 2q 0 Z Projected completion date

Asbestos work schedule ❑ Monday ❑ Tuesday ❑ Wednesday ❑ Thursday ❑ Friday ❑ Saturday ❑ Sunday

Shift from: _____,_❑am ❑pm to Elam ❑pm

If other, specify _ _

Access to inspect the premises must be provided during the work schedule indicated in this item.

25. Total amount of asbestos-containing material to be abated during this work

55 , 620 Square Feet, and/or Linear Feet .. f )'CP 7 2/2001

NYC-WTC 000118440

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000118440Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →