Post-9/11 cleanup timeline, 375 South End Ave

Machine-extracted title · confidence 100%

Management report detailing the post-September 11 evacuation, cleaning phases, and re-occupancy timeline for buildings at 375 South End Avenue.

NYC-WTC_000117489–000117492

Folder label: “375 345 SOUTH END AV 1083378, 16/100

Page image
Scanned page image, NYC-WTC_000117489
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Gateway Plaza Management Corporation 375 South End Avenue New York, NY 10280

Manager: Tom DeFrancesco (212) 321-3812 / 2000

Timeline:

On 9/11, Gateway Plaza was completely evacuated. The property was used by FEMA, FDNY, and NYPD for the next several weeks. In the 2"d week post 9/11, staff members began clean-up of the buildings and surrounding areas. Initial clean-up was done by Maxon Services. A second round of cleaning was done by the Southern Baptists and a third round of cleaning was done by Maxon Services. In total, the Gateway Plaza Management Corporation has spent several millions of dollars on post 9/11 environmental sampling and clean-up efforts. All sampling and clean-up activities were at cost to the landlord; cost of clean-up of personal property (i.e., furniture, clothing) was the responsibility of the tenant.

10/13: Building 200 re-occupied —10/20: Buildings 300 and 400 re-occupied —10/27: Buildings 100 and 500 re-occupied 12/20: Building 600 to re-occupy

Environmental Sampling:

ALC Environmental Incorporated (ALC) was contracted to perform visual assessments, bulk sampling, and air sampling to identify any asbestos contaminant at Gateway.

Building 100: Tested 9/25, 10/5, 10/13, 10/14/01 1. Eight initial background air samples were collected and analyzed via PCM; 5 were analyzed via TEM. After analysis via TEM, all were below the permissible limits.

2. Forty bulk samples were collected and analyzed by PLM. Zero were found to be above regulatory limits.

3. Twenty-nine air samples were collected and analyzed by TEM. The results indicated that the living areas achieved the acceptance criteria below <70 structures per mm2.

Gateway Plaza

NYC-WTC 000117489

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000117489Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →