2.1 Central Ventilation System Visual Insnection Form Pegs 1 of 2
Ventilation System IdentificA -
A`1"t!
Location:
Std
Associated mechanical room: clean Y N dry Y N stored chemicals/refuse ~ Y N
Surface Component
System Components Dust/ WTC • not present
[NOTE: If component not present (NP), not found (NF) or inaccessible (1) please Debris Dust • not found
indicate in last column] Present? Present? ,
inaccessible
Outside air intake: Location:
Accessible for inspection? Y ✓ N (explain):
- louvers, grates and/or screens
- outside air duct
- outside air damper(s) ti
Air handling unit:
- outside air mixing chamber
- filter racks)
- filter media
- blower assembly incl. blower wheel, blower housing, air vanes, in-line noise attenuators
- blower housing acoustical lining
- pre-heat coils
- heating coils
- cooling coils .
- re-heat coils i
- condensate drain pan
- supply air plenum
- supply air plenum damper(s)
- vibration collars
Supply air distribution: , ..
01)
- Supply air ducts Est. total In ft
Specify type (circle): (
' ' '
glass
No. locations inspected_
sous r ,
f
- Accessible in-line fire dampers Est total qty No. locations inspected
y r jJ
- Accessible turning vanes Est total qty No. locations inspected h F
- In-line reheat/cooling coils Est total qty No. locations inspected
Supply air diffusers Est total qty 7 No. locations inspected I N
Return air distribution: ti
- Return air ducts Est total In ft , No. locations inspected_
Specify type (circle): metal Brous Glass lined metal mascary flirous glass board ~—
$
- Return air plenum Est. total RA plenum areas_ No. locations inspected_
- Return air plenum damper Est total qty No. locations inspected f)
N
- Accessible in-line fire dampers Est. total qty No. locations inspected F
- Accessible turning vanes Est total qty No. locations inspected NF
- Return air grilles Est. total qty t_ No. locations inspected & y
NYC-WTC 000116196
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000116196Source: NYC Law Department, mirrored locally
EPA correspondence transmitting the final HVAC system inspection checklist and implementation guidance for use by contractors in post-9/11 building cleanup and ventilation system…