NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.3
☕ Buy me a coffee
← Document results/Asbestos - BOX 10/29 PARK ROW 1001251, 90/10
Document / 18 pages

Fax cover sheet regarding DEP asbestos matter, Nov 2002

Machine-extracted title · confidence 85%

Confidential fax cover sheet from Ross & Harries to the Department of Environmental Protection regarding a specific matter.

NYC-WTC_000115599–000115616

Folder label: “29 PARK ROW 1001251, 90/10”

Page image
Scanned page image, NYC-WTC_000115609
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

NOV.13.2002 4:22PM ROSS & HPRDIES tC.979 P.10

An ACP7 foam signed by the contractor and lrrinitodng xm shall be submitted directly to the DP representative on she. The DEP shall provide notiAoadon to the )WS DOL.'The size of the project, specified area, shall be indicated on the ACP7 form.. Building owners Shall provide written authorization to the DEP for the work activities.

IDBP will coordinate activities with building owners and other city agencies.

The sites and specific areas to be cleaned shall be deteimined and specified by the DEP.

The contractor shall restrict access by the public to the work area(a)during clean-up activities. Caution tape and warning signs shall be used to identify work areas, Access aball be limited to the contractor,his employees,and Federal,State or local officials. •. The contractor shall provide all necessary equipucaent, to remove,bag, transport, and dispose collected waste. Me contractor is responsible for supplying all necessary equipment. The specific clean-up procedures for building,roofsan sttao)sed. The DEP shall cor>$ider substitution of the specified methodologies only lithe request is received in writing. Any substitutions must receive prior approval by the DEP. f For large asbestos cleanup projects, a partial decontami ion system(changing room,and shower)shall be required at an sentry/exit from each work area. A remote decontamination system shall be acceptable with DEP on-site approval. . contractor Dnssllflcattons

The contractor shall have on staff and assigned to the contract a sufficient number ofproperly trained and certified workers. See above.

Page2 05/03/02

NYC-WTC 000115609

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000115609Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →