An ACP7 foam signed by the contractor and lrrinitodng xm shall be submitted directly to the DP
representative on she. The DEP shall provide notiAoadon to the )WS DOL.'The size of the project,
specified area, shall be indicated on the ACP7 form.. Building owners Shall provide written authorization
to the DEP for the work activities.
IDBP will coordinate activities with building owners and other city agencies.
The sites and specific areas to be cleaned shall be deteimined and specified by the DEP.
The contractor shall restrict access by the public to the work area(a)during clean-up activities. Caution
tape and warning signs shall be used to identify work areas, Access aball be limited to the contractor,his
employees,and Federal,State or local officials. •.
The contractor shall provide all necessary equipucaent, to remove,bag, transport, and dispose collected
waste. Me contractor is responsible for supplying all necessary equipment.
The specific clean-up procedures for building,roofsan sttao)sed. The DEP shall cor>$ider substitution of
the specified methodologies only lithe request is received in writing. Any substitutions must receive
prior approval by the DEP.
f For large asbestos cleanup projects, a partial decontami ion system(changing room,and shower)shall
be required at an sentry/exit from each work area. A remote decontamination system shall be acceptable
with DEP on-site approval. .
contractor Dnssllflcattons
The contractor shall have on staff and assigned to the contract a sufficient number ofproperly trained and
certified workers. See above.