NOV.13.2002 4:22PM ROSS & HARDIES tC.979 P.10
An ACP7 form signed by the oontractor arid aIr-tlidraftodng rm shall be submitted directly to the DP
representative on she. The DEP shall provide notiata don to the )WS DUI.:' The size of the project,
specified area, shall be indicated on the ACP7 form.. Building owners shall provide written authorization
to the DEP fbr the work activities.
DBP will eoorduiate activities with building owners and other city agencies.
The sites and specific arils to be cleaned shall be determined and specified by the DEP.
The contractor shall arestrict access by the public to the area (a) during clean-up activities. Caution
work
tape and warning signs shall be used to identify work areas. Access shall be limited to the contractor, his
employees, and Federal. State or local officials. •
The contractor shall provide all necessary a uip*na d, remove, bag. transport, and dispose collected
to
waste.. The contractor is responsible for supplying •ell necessary equipment.
The specific clean- procedures fbr building,
up
are attaolaed. The DEP shall coa>$ider substitution of
roofs
the specified methodologies only if the request is received in writing. Any substitutions must receive
p r approval by the DEP.
f Por Large asbestos clean-up projects, a partial decontamfilation s tem (changing room and shower) shall
be required at an entry/exit from each work area. A remote dcoontamuaation system shall be acceptable
with DEP on-site approval. -
contractor OulUleaNens
The contractor shall have on staff and assigned to thet contract a sufficient number of properly trained and
certified workers. See above.
Page 2
03!03/02
NYC-WTC 000115609