shall be submit" directly to the DEP
An ACP7 form signed by the contractor and air-monitoring firm NYS DOL. Tie size of the project,
representative on site. The DEP shall provide notification to the
provide written authorization
specified area, shall be indicated on the ACP7 form.. Building owners shall
to the DEP for the work activities.
agencies.
DEP will coordinate activities with building owners and other city
the 1)EP.
The sites and specific areas to be cleaned shall be determined and specified by
clean-tip activities. Caution
The contractor shall restrict access by the public to the work area (s) during
lirnite l to the contractor, his
tape and warning signs shall be used to identify work areas, Access shall be
employees, and Federal, State or local officials.
an I dispose collected
The contractor shall provide all necessary equipment, to remove, bag, transport,
waste. The contractor is responsible for supplying all necessary equipment.
shall a; rnsidcr substitution of
The specific clean-up procedures for building roofs are attached. The DEP substitt.tions must receive
the specified methodologies only if the request is received in writing. Any
prior approval by the DEP. •
room and shower) shall
For large asbestos clean-up projects, a partial decontamination system (changing shall be acceptable
be required at an entry/exit from each work area. A remote decontamination systen
with DEP on-site approval.
Co tractor OuslificatiOns
number of properly trained and
The contractor shall have on staff and assigned to the contract a sufficient
certified workers. See above.