Emergency asbestos project notification form, 250 Vesey Place, 2002

Machine-extracted title · confidence 100%

NYC DEP emergency notification form documenting an urgent asbestos abatement situation at 250 Vesey Place requiring immediate action.

NYC-WTC_000112116–000112126

Folder label: “20 VESEY STREET; 1001235, 88/5

Page image
Scanned page image, NYC-WTC_000112125
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

NOV. 20. 2001 3:29PM FF CATASTROPHE NO. 652 P. 9

Part 3 —Execution

3.1 Pre-Construction Meeting

A. The contractor shall attend a pre-construction conference at the job site at a date to be defined by the owner. The conference will be with the owner or the owner's authorized representative and the Project Monitor. Agenda for this conference will include, but not be limited to:

1. Contractor's work plan or scope of work letter as defined in section 1.2 C 1

2. Contractors plan for collection and analysis of OSHA compliance samples

3. Contractor's fire prevention plan

4. Contractor's plan for job security both for prevention of theft and for barring entry of curious but unprotected personnel into work areas

5. Documentation of compliance with environmental laws and standards.

B In conjunction with the pre-construction conference, the contractor shall accompany the project monitor on a pre-construction walk-through, documenting existing condition of finishes and furnishings, reviewing overall work plan, location of fire exits, fire protection equipment, water supply, and temporary electrical tie-in location(s).

3.2 Utilities

A. The contractor will furnish water needed for construction. Shower water for the decontamination unit shall be individually adjustable hot and cold at the shower unit.

B. The owner will pay the cost of the electricity needed for the project.

C. All of the contractor's temporary lighting and electrical services for the work area shall be in weatherproof enclosures and shall be individually ground fault protected as required by local state and federal regulatory agencies.

D. The contractor shall provide the electrical panel to be used for the project, which will be hooked up by the owner's electrician. All other electrical work shall be performed by a locally licensed electrician, including providing electrical tie in to electrical utilities at a location designated by the owner.

E. All wiring must be copper wire of an appropriate gauge to safely handle the load, voltages and current requirements of the equipment being operated.

3.3 Asbestos Waste Disposal Requirements

A. Transportation and Disposal Site

1. The contractor's Disposal Site shall be subject to approval by the Owner.

7

NYC-WTC 000112125

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000112125Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →