NYC 9/11 Public Portal Document
ASBESTOS INSPECTION REPORT (continued)
sbestos Transportation
26. Asbestos HaulerCo.. NYS DEC Permit # 1A-371 TEL.#
631-924-5050
DisposalSite(s)Imperial/POB 47, 11 Boggs Rd., PA, Southern Alleghenies/Rd 3
Box 310, Valleyview, PA
27. This asbestos abatement is part of a (Item a through e requires filing of this form with NYC Department of Buildings)
a) 0 Demolition b) ❑ Boiler Replacement c) ❑ Sprinkler Replacement d) El Renovation/Alteration
e) 0 Fireproofing Replacement I) ❑ Other (Describe) _ _
28. TYPE OF ABATEMENT (Check all appropriate boxes)
❑ Removal ❑ Enclosure ❑ Encapsulation ❑ Repair ❑ Clean up
29. ABATEMENT PROCEDURE (Check all appropriate. boxes)
❑ Full Containment ❑ Glovebag ❑ Tent ❑ DEP Variance Application
30. LOCATIONS OF ABATEMENT
DESCRIBE SECTION AFFECTED SURFACES AMOUNT OF ACM DESCRIPTION OF WORK BEING
Floor(s) OF FLOOR CONTAINING ACM
(e.g. entire, east wing, room #, (e.g. Pipe tagging. ceiling, plenum SQUARE LINEAR
PERFORMED
te. r running cable. lcin
installingb fire ,
sprinklers,
boiler room, lobby, etc ducts, slora a tanks, decking, etc. FEET FEET removing and replacing boilers, etc.)
4th Item No. 2 Roof only, no 3,500
equipment except
intake louvers
15th Item No. 2 Roof (partial) 1,500
31. I hereby declare that the information provided herein is true and complete to the best of my
knowledge. lam familiar with Federal,.
State and NYC laws and regulations applicable to asbestos related work.
Warren & Panzer Trio Asbestos Removal NYC
Print Name of Air Monitor Print e t s onlraclo~0 r Print Name licant (If other than Owner)
p
/
Si lure Signature Signature
Date
(_ (/2//&_
Date
___________
Date
32. I understand that as the owner of a building where asbestos abatement activity occurs, I am responsible for
the performance of
the asbestos abatement activities in accordance with the Asbestos Control Program Rules. I have
contracted the third pajty air
monitor who is completely independent of all parties involved in the asbe oject. I hereby declare that I hay authored the
filing of this notification for the work specified herein.
Brown Brothers Harriman c/o NYC 1,
d
Print Name of Owner Signature Date
A STAMPED COPY OF THIS FORM INCLUDING AMENDMENTS MUST BE AVAILABLE AT THE WORK SITE.
LA ny modification of information provided on this form must be reported immediately in writing directly to
the NYC DEP ACP.
of the Asbestos Control Program Rules may not be lawfully avoided or lessened ACP7
ugh the performance of work in incremental or piecemeal fashion. 212001
NYC-WTC 000111495
OCR can misread numbers and units. Confirm readings against the page image before using them.