Asbestos Project Notification form, Oct 2001

Machine-extracted title · confidence 90%

NYC DEP Asbestos Project Notification form for an inspection report submission.

NYC-WTC_000111453–000111499

Folder label: “Zone III Originals

Page image
Scanned page image, NYC-WTC_000111471
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION Asbestos Control Program 59-17 Junction Boulevard, 8” Floor, Corona, NY 11368-5107 1103 Muah] Building Dept. or TRU No ASBESTOS PROJECT NOTIFICATION FOR OFFICIAL USE ONLY (ASBESTOS INSPECTION REPORT) 1. LY CD er (Sed-fee schedule) : When submitting this form at the NYC Department of Buildings, the original form and three (3) copies with original signatures are required. Submittal at the NYCDEP requires one copy of the form with original signatures. This form must be submitted to the NYC DEP not less than one week in advance of the start of abatement activities . 1. FACILITY AKA 5. Type of Facility. il. BUILDING OWNER 9. Tet. # (908) 753-6264 2. Address 110 Liberty Street / 113-117 Cedar Street Borough Manhattan Zip. 10004 3. Block 4. Lot 6. Name of Building ° 7. Name Baldwin Realty, c/o Charles Gangler 8. Contact Person Fax # City State Zip 10. Address iil. GENERAL CONTRACTOR Tel. # 11. Name iv. ASBESTOS ABATEMENT CONTRACTOR 12. Name Trio Asbestos Removal Corp. 43. Contact Person Steven Parmigiani 14. Federal Employer 1D. # V. THIRD PARTY AIR MONITOR Pil (718) 961-4100 (718) 961-4103 15. Tel. # Fax # 46. Address 14-20 129 Street City College Point State NY Zip 11356 Michael Nolan 17. Name Warren & Panzer Engineers, P.C. 18. Contact Person 19. Federal Employer ID. # 21. Address 228 East 45th Street Fax # (212) 922-0630 10017 20. Tet. # (212) 922-0077 City NY State NY Zip Warren & Panzer Engineers 23. NYS OOH ELAP # 11251 22. Sample Analysis Laboratory. Vi. PROJECT INFORMATION 24. Starting date for this portion of work _] ipl er Projected completion date _ 7/3 ok Asbestos work schedule pf Monday ANT uesday Et Wednesday “EI Thursday DFtiday D-saturday- Ef Sunday Shift from: a a] am QO) pm to a Olam pm If other, 31] 1% specify Access to inspect the premises must be provided during the work schedule indicated in this item. 25. Total amount of asbestos-containing material to be abated during this work NYC-WTC_000111471 _ 12,678 Square Feet, and/or_ 0 Linear Feet

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000111471Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →