Document / 47 pages

Asbestos Project Notification form, Oct 2001

Machine-extracted title · confidence 90%

NYC DEP Asbestos Project Notification form for an inspection report submission.

NYC-WTC_000111453–000111499

Folder label: “Zone III Originals

Page image
Scanned page image, NYC-WTC_000111481
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

00 +a, utr rw~, OF ENVIRONMENTAL PROTECTION • ' +, I ti, ; Asbestos Control Program 59-17 Junction Boulevard, 8'" Floor, Corona, NY 11368-5107 N1 Building Dept. or TRU No A D FOR OFFICIAL USE ONLY ONLY TYPEWRITTEN •~, ~ /` ASBESTOS PROJECT NOTIFICATION FORMS WILL BE 'O"& .N!~!j1O ' (ASBESTOS INSPECTION REPORT) ACCEPTED +..rc.sa.roco 1• See teeschedule) When submitting this form at the NYC Department of Buildings, the original form and three (3) copies with original signatures are required. Submittal at the NYCOEP requires one copy of the form with original signatures. This form must be submitted to the NYC DEP not less than one week in advance of the start of abatement activities .

I. FACILITY

2. Address _ 49 Broadway —_ — BoroughManhattan Zip_ 1 0006 AKA_ — _25 Trinity Place —3. Block 20 4. Lot 13 5. Type of Facility_— 6. Name of Building

II. BUILDING OWNER rn 'C Cl 7. Name Stahl Midtown Property 8. Contact Person 2"1Z C4 Zc 5000 9. Tel. # 212-425-5000 Fax# 10. Address City State Zip

III. GENERAL CONTRACTOR

11. Tel. #

IV. ASBESTOS ABATEMENT CONTRACTOR

12. NameTri n AshAst- nc Removal Cr rp - -- 13. Contact Person Chris Horan

14. Federal Employer ID. # - _P-- _ 15. Tel. # 7L&- 61- 41 OQ_ Fax 971 A - 9 61 - 41 0 3

16. Address _1 4_ 2 0 1 2 9th S LXjae t __ City c 1 1 eg PQip.,t__ State NY Zip_U.356

V. THIRD PARTY AIR MONITOR

17. NameWarren & Panzer Engineers, P.C. --- 18. Contact PersonKi-chael Nolan

19. Federal Employer ID. # 20. Tel. #212-922-007 Fax # 212-9220630 21.Address2 28 East 45th Street _city New York Staten _Zip10017 22. Sample Analysis Laboratory Warren & Panzer Engineers 23. NYS DOH ELAP # 1 1 251 —__

VI. PROJECT INFORMATION 24. Starting date for this portion of work __/r) /O2 Projected completion date 7 (JJa2'

Asbestos work schedule 0 Monday ❑ Tuesday ❑ Wednesday 0 Thursday ❑ Friday ❑ Saturday 0 Sunday

Shift from: ____Dam ❑pm to Dam ❑pm i " ` 1\ If other, p 4, specify _—_-- ----- I\ [CCEIVEU 1 i

Access to inspect the premises must be provided during the work schedule indicated in this item. ! -' 1u N ^ C 2002 U U nPlN' ti 25. Total amount of asbestos-containing material to be abated during this work ` S'GSL_-. ~GGPar: 0 . Square Feet, and/or Linear Feet TPUG N ~ /. ACP 7 ~G Z 211001

&RFAUarE E► RE'4.E,Lft UIr1V~l 4S2 °t9S ~, .NORCEMfNr PI►~spy1 4pl rgg7

NYC-WTC 000111481

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000111481Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →