NYC 9111 Public Portal Document
+
Ly
O( -~' utr ocnuy: NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION
to
VV t~ ~:~'O`•T' '"+.4 Asbestos Control Program
ti 59-17 Junction Boulevard, 8 Floor. Corona, NY 11368-5107
ONLY
TYPEWRITTEN .
D-~ P
4' ASBESTOS PROJECT NOTIFICATION
Butdwg Dept. or TRU No
FOR OFFICUL USE ONLY
FORMS WILL BE (ASBESTOS INSPECTION REPORT)
ACCEPTED I ~.+..rcciaer ) 1.
When submitting this form at the NYC Department of Buildings, the original form and three (3) copies with original
signatures are required. Submittal at the NYCOEP requires one copy of the form with original signatures. This
form must be submitted to the NYC DEP not less than one week in advance of the start of abatement activities.
I. FACILITY
2. Address_ 25 Trinity Place —BorougtManhattan Zip 10006
AKA 4g_B.raad wiy --- 3. Block 20 _ 4. lot 13
5. Type of Facility—, 6. Name of Building
II. BUILDING OWNER
7. Name Stahl Midtown Property .8. Contact Person
9.Tel.# 212-425-5000 Fax#
10. Address City State Zip
III. GENERAL CONTRACTOR
11. Name-- — Tel. #
IV. ASBESTOS ABATEMENT CONTRACTOR
12. Name Trio Asbestos Removal Corp. 13. Contact Person Chris Horan
14. Federal Employer ID. # j ._._._._.P 1- 15. Tel. #718 9 61 41 0 0 _ Fax # 71 8-961 -4103
16. Address 1 4_20 1 29th Street City College Point _ State NY Zip 1 1 356
V. THIRD PARTY AIR MONITOR
17. NameWarren & Panzer Engineers, P.C. ~ - 18. Contact Person Michael Nolan
19. Federal Employer ID. # 20. Tel. # 212-922 0 077 Fax 21 2-922-0630
21. Address22.asi -_ 4 ,t - h SI- rapt- City New York — Stat'1Y Zip 1 0017
22. Sample Analysis Laboratory Warren & Panzer Engineers 23. NYS DOH ELAP # 11251
VI. PROJECT INFORMATION
24. Starting date for this portion of work _ ' / /?— Projected completion date 1 7/C Z
Asbestos work schedule ❑ Monday ❑ Tuesday ❑ Wednesday ❑ Thursday ❑ Friday ❑ Saturday ❑ Sunday
Shift from: —+— ❑am ❑pm to Dam ❑pm u t j J/
If other, 4 /
<
specify -----
-- -- ,.\J' RECEIVED
Access to inspect the premises must be provided during the work schedule indicated in this item.
.~h ~ 6 2002
25. Total amount of asbestos-containing material to be abated during this work
CDR'
Square Feet, and/or Linear Feet ,\ 'R.Ju
2 ~•
,OTT k ACP7
.3t.
euRE1u Or EtNf11114y t~l
Qf~'Ei+17✓1'f S fhc9RCE
4;df:~9S Cu'ATf10l
f~t~iP~hl
NYC-WTC 000111479
OCR can misread numbers and units. Confirm readings against the page image before using them.