NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 39/Zone II Originals
Document / 38 pages

Asbestos Project Notification form, Corona NY

Machine-extracted title · confidence 90%

NYC DEP Asbestos Project Notification form for inspection report submission.

NYC-WTC_000111229–000111266

Folder label: “Zone II Originals

Page image
Scanned page image, NYC-WTC_000111247
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION Asbestos Control Program ___ 59-17 Junction Boulevard, 8'" Floor, Corona, NY 11368-5107 4 /I i building OepL or TRU No ONLY FOR OFFICIAL USE ONLY ASBESTOS PROJECT NOTIFICATION (ASBESTOS INSPECTION REPORT) (Ste fee schedule) When submitting this form at the NYC Department of Buildings, the original form and three (3) copies with original signatures are required. Submittal at the NYCOEP requires one copy of the form with original signatures. This form must be submitted to the NYC DEP not less than one week in advance of the start of abatement activities .

I. FACILITY

2. Address 10 Maiden Lane • _ BoroughManhattan Zip 1 0005 64 3. Block 4. Lot 21 5. Type of Facility___ 6. Name of Building _ _ II. BUILDING OWNER

7. Name Lillian Seril c/o LPB Mgmt. Co. 8.ContactPerson

9. Tel. # Fax #

10. Address City State Zip III. GENERAL CONTRACTOR

11. Name Tel. #

IV. ASBESTOS ABATEMENT CONTRACTOR

12. Name Trio Asbestos Removal Corp. 13. Contact Person Chris Horan 14. Federal Ernp!oyerlD ._._._._._._._._PII 15. Tel # _7! .2 1-4100 Fax# 718-961-4103 16. Address?4-20 129th Street CilyC011ege Point _State NY Zip 11 356 V. THIRD PARTY AIR MONITOR

17. Name Warren & Panzer Engineers, P.C. l8 Contact Person Michael Nolan 19. Federal Employer ID. # 20. Tel. # 21 2-922-0077 Fax # 21 2-922-0630 21.Address_228 East 45th Street City New York State NY Zip 10017 22. Sample Analysis Laboratory Warren & Panzer Engineers 23. NYS DOH ELAP # 11251 VI. PROJECT INFORMATION

24. Starting date for this portion of work 2C c 1— Projected completion date

Asbestos work schedule ❑ Monday ❑ Tuesday 0 Wednesday ❑ Thursday ❑ Friday 19 Saturday IN Sunday

Shift from: _0am ❑pm to 2 Dam pm 3 9 t^~ If other, specify Ra vEM Access to inspect the premises must be provided during the work schedule indicated in this item. _! I l) 1 9 2002 C~ - ,PrBANN~ 25. Total amount of asbestos-containing material to be abated during this work • J,SO ) Square Feet. and/or Linear Feet 3 TRUG

Z ACP 7 moot

NYC-WTC 000111247

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000111247Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →