NYC 9/11 Public Portal Document
New York City Department of Environmental Protection
Bureau of Environmental Compliance
WTC Unoccupied Building Monitoring Program
125 Cedar Street
Scope of Work
Project #WTC_UNA
A MANDATORY PRE-BID meeting is scheduled for August 28, 2002 at 1:00 P.M. at 125 Cedar Street,
Building Lobby, New York, N.Y. This conference will include a walk through of the entire building.
Background
A follow-up visit to 125 Cedar Street revealed debris and significant dust accumulation present on surfaces
throughout the interior of the building. The interior cleaning is to be accomplished by a licensed asbestos
abatement contractor and monitored by a Monitoring Contractor.
Purpose
The Monitoring Contractor shall provide personnel experienced, trained, and certified in environmental sampling
and asbestos air monitoring to be on-site, full-time, during work area preparation and cleaning phases of building
interiors (12 stories and a penthouse-5,000 to 6,000 square feet per floor). The Monitoring Contractor shall
provide qualified staff to observe the work, conduct air monitoring, and monitor the cleanup of the building
interiors to ensure compliance with the project specifications and appropriate regulatory requirements. The
Monitoring Contractor shall provide clearance sampling and analyses.
The Monitoring Contractor shall provide qualified staff to collect samples for lead, polyaromatic hydrocarbons
(PAHs), dioxin, fibrous glass, crystalline silica and mercury.
An accredited laboratory shall perform all sample analyses.
The Work shall be performed 24 hours per day, seven (7) days per week
Contract Term
This contract shall be in force for 90 consecutive calendar days from the DEP commencement date. Contractors
must be prepared to mobilize within 72 hours of the contract award.
Air Monitoring/Construction Inspection Services
Air monitoring by a Monitoring Contractor shall be conducted during all cleanup activities. The Monitoring
Contractor shall provide individuals certified as project monitors and air sampling technicians to perform daily
air sampling and inspections from the commencement of the project through final air clearance sampling. The
Monitoring Contractor shall provide sufficient equipment and experienced personnel to monitor work area
preparation and cleaning phases of the building interiors.
1 of 5
NYC-WTC 000107194
OCR can misread numbers and units. Confirm readings against the page image before using them.