This was accomplished using the Hospital's paramedics and ambulances. To
get an idea of the scale, our hospital has approximately (170) beds in
operation. We even used a newly constructed 26-bed medical/surgical unit,
undergoing punchlist work for ambulatory patient care.
Shortly after Tower 2 collapsed, we lost gas and high-pressure steam service
to the hospital. This was a part of a large-scale shutdown of services by Con
Ed based on their concern about gas and steam leaks. In addition, due to the
number of hydrants opened by the fireman, to fight the fires, the Hospital
also lost water pressure to the building, causing the fear of losing water
all together. Immediately staff were notified to conserve water.
As each of the two towers fell, it caused the ground below the hospital to
shake and the windows to rattle, much like an earthquake. While this caused
significant fear in many of our employees, staff continued to provide
emergency medical attention to victims. By 4:00 PM on Tuesday, gas and
high-pressure steam had been restored, based on re-routing done by Con Ed.
Before the gas was turned on, Con Ed made extensive tests to assure that
there were no leaks. Also by 5:00 PM, the water pressure had slowly started
to increase, and the Hospital was able to begin again sterilizing instruments
and providing domestic hot water. However, a little after 5:00 PM, after
Building #7 collapsed (this was the third building to collapse), the hospital
lost electrical power from Con Edison. The emergency generator immediately
came on, which would allow us 24-36 hours of power, based on the diesel fuel
on-hand and demand.
We were concerned that we do whatever was necessary to keep the generator
functioning, as it is located on the roof and was being covered by inches of
dust during this period. So we stationed maintenance staff, in protective
clothing, in four-hour shifts, to keep the machine clean and to check
controls on a regular basis. We needed a tank of diesel fuel for refilling
the generator, but having a fuel truck in the area, during that period, was
deemed unsafe. So Con Ed agreed to "top off' the generator twice a day (which
they did through the following Monday, six days later, when power was finally
restored).
In addition, we arranged for Con Edison to provide an additional generator
outside the Hospital in case ours failed. Unfortunately, they were only able
to provide a smaller generator (1200kW) than our existing equipment (1500kW)
--- therefore, if our generator had failed, it would have been necessary for
the Engineering staff to manually open and close the service and distribution
switches, to maintain power in the hospital.
Since the electrical power was out all over lower Manhattan, we also had no
streetlights. GE delivered portable light towers and those were set up
outside of the hospital. GE also delivered and set up a portable Cat Scan