Document / 137 pages
OSHA air sample results chain of custody, 55 Church Street
Machine-extracted title · confidence 85%Chain of custody documentation for OSHA-compliant air sampling and abatement verification at the hotel located at 55 Church Street.
NYC-WTC_000103467–000103603More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Air sampling correspondence, 20 Dey Street, Feb 2002 · page 163 · Box DEP Box 36NYC-WTC_000103723
Cover letter dated February 22, 2002 from LMB Inc. regarding air sampling activities at 20 Dey Street and surrounding addresses.
Similarity score 0.962 (not a probability)
PCM air sample results chain of custody, 200 Park Avenue · page 33 · Box DEP Box 36NYC-WTC_000103205
Chain of custody forms for personal protective equipment and air sampling results conducted at 200 Park Avenue by Testwell Laboratories.
Similarity score 0.962 (not a probability)
Sampling summary report, PS/IS 89M, Feb 2002 · page 39 · Box DEP Box 02NYC-WTC_000096460
Cover letter summarizing wipe and air sampling results for asbestos and other contaminants at PS/IS 89M dated February 7, 2002.
Similarity score 0.962 (not a probability)
Invoice for asbestos removal, 211 Broadway, July 2002 · page 9 · Box DEP Box 49NYC-WTC_000123626
Invoice from Asbestos Removal Corp dated July 25, 2002, detailing roof cleanup services at 211 Broadway.
Similarity score 0.960 (not a probability)
Chain of custody for unit ventilator lead wipe samples · page 96 · Box DEP Box 36NYC-WTC_000102902
Documentation tracking the collection and transport of lead wipe samples from unit ventilators at a World Trade Center site location.
Similarity score 0.960 (not a probability)
Asbestos Removal Invoice, 26 Wall Street, June 2002 · page 34 · Box DEP Box 40NYC-WTC_000112249
Invoice for roof cleanup services involving asphalt and gravel removal totaling over $24,000 at 26 Wall Street.
Similarity score 0.960 (not a probability)