Resident walk-throughs and equipment mobilization, Mar 2003

Machine-extracted title · confidence 85%

Project update on resident notifications and contractor equipment mobilization for decontamination systems.

NYC-WTC_000102668–000102670

Folder label: “E-mail / Correspondence

Page image
Scanned page image, NYC-WTC_000102668
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Theodorellys, Penny

From: Theodorellys, Penny Sent: Thursday, March 06, 2003 12:09 PM To: '[email protected];'[email protected]'; '[email protected]; '[email protected]; '[email protected]; '[email protected]; '[email protected]; '[email protected]; [email protected]; '[email protected]; '[email protected]; '[email protected]; '[email protected]'; '[email protected]; '[email protected]; '[email protected]; '[email protected]'; '[email protected]; 'Fernandez' Cc: '[email protected]; '[email protected]'; Gilsenan, Michael; Radhakrishnan, Krish Subject: 114 Liberty Street

Good Morning.

The "walk-throughs" with residents have been completed. The cleaning contractor, ETS, has started to mobilize equipment to the building. He has started a pre-cleaning on the ground floor to allow for the construction of the equipment and worker decontamination enclosure systems. The systems should be completed by the end of today's shifts. Today, he will also be bringing in his negative pressure ventilation equipment and placing the units on the floors that are ready. The environmental consultant, JLC, has been sampling for the past two days and representatives will be present again today. As you are aware, JLC is monitoring the project activities and will have a project monitor on site during all the cleaning contractor's activities.

A proposed schedule of the work has been supplied to building representatives and is available at your lobby. However, once the project begins access to the building will be restricted. Entry must be through the worker decontamination enclosure system and a sign-in log must be maintained (the sign-in log is mandated by the rules and will be applicable until satisfactory clearance results are received). Only certified individuals and authorized visitors with proper equipment will be permitted to enter the building including the lobby. The contractor will allow immediate access to representatives of regulatory agencies on official business and verify whether anyone else is authorized to enter by reaching out to DEP. According to the current project design, the entrance on Liberty Street will be closed and sealed. Entry will be via the loading dock and building representatives will be present at the ground floor in the areas outside the decontamination enclosure systems.

As most of you are aware a number of issues and "items to be addressed" resulted from the "walk-throughs". I also received a number of e-mails and wanted everyone to have the opportunity to receive the responses.

NYC-WTC 000102668

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000102668Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →