Asbestos contractor permit application, 114 Liberty Street, 2003

Machine-extracted title · confidence 90%

Permit application for a licensed asbestos contractor to clean interior dust at the unoccupied 114 Liberty Street building.

NYC-WTC_000100690–000100701

Folder label: “114 LIBERTY STREET 1001041, 52/7502

Page image
Scanned page image, NYC-WTC_000100690
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

New York City Department of Environmental Protection Bureau of Environmental Compliance WTC Unoccupied Building Cleaning Program 114 Liberty Street Scope of Work Project #WTC-LBC

A MANDATORY PRE-BID meeting is scheduled for February 18, 2003 at 10:00 A.M. at 114 Liberty Street, Building Lobby, New York, N.Y. This conference will include a walk through of the entire building.

Background

A site visit at 114 Liberty Street revealed minor amounts of dust accumulation present on horizontal surfaces throughout the interior of the building. The building is currently unoccupied. The interior cleaning is to be accomplished by a licensed asbestos abatement contractor.

Purpose

A New York State Department of Labor (NYSDOL) licensed asbestos contractor with NYCDEP and NYSDOL certified workers shall perform the clean-up of building interiors (12 stories —5,000 to 6,000 square feet per floor). Each apartment occupies an entire floor with the exception of the top floor that is a duplex and the apartment on the third floor that shares the floor with two commercial spaces. The entire interior of the building (residential, commercial, retail spaces, common spaces, etc.) is included in this work. The building has central HVAC systems on each floor.

Contract Term

Contractors must be prepared to mobilize within 24 hours of the receipt of the Commence Work letter. This contract shall be in force for 90 consecutive calendar days from the DEP commencement date. However, work must be completed within three (3) weeks of the commencement, date. Work shall be performed 24 hours per day, seven (7) days per week.

Scope of Work

(1) All work performed shall be in compliance with all applicable, relevant, and appropriate regulations, including but not limited to those of the United States Environmental Protection Agency (USEPA), the United States Department of Labor, the New York State Department of Labor (NYSDOL), the New York State Department of Environmental Conservation, the New York City Department of Sanitation, the New York City Department of Health (NYCDOH), and the New York City Department of Environmental Protection. (NYCDEP).

(2) An ACP-7 form, asbestos project notification form shall be submitted as required by Title 15, Chapter 1 of the Rules of the City of New York (RCNY), directly to the NYC DEP Asbestos Control Program prior to the start of work. USEPA and NYSDOL notification shall be submitted.

(3) A third party air monitoring firm shall perform air sampling and provide project oversight.

1 of 5 2/7/03

NYC-WTC 000100690

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000100690Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →