NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 34/120 NASSAU STREET 1001275, 92/27 Street
Document / 2 pages

WTC visual survey form, 120 Nassau Street, 2002

Machine-extracted title · confidence 100%

Visual inspection form recording facade and setback conditions at 120 Nassau Street following the WTC attacks.

NYC-WTC_000098826–000098827

Folder label: “120 NASSAU STREET 1001275, 92/27 Street

Page image
Scanned page image, NYC-WTC_000098827
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document Asbestos Inspection Report Premise No. NASSAU STREET Floor ROOF Zip AND Borough FACADE Inspector Building Type Dennis Antzoulatos MIXED USE Contractor's Name Benjamin Kurzban & Son Control Address City 1248 Ralph Avenue, Brooklyn Block 92 Lot 27 Basis of Inspection WTC Survey Sample Number N/A Sample Number N/A Sample Number N/A Owner's Name Inspection Date: AS NOTEO Squad # Badge# N/A A020 Photos Taken Yes/ No (718)531-2900 Laboratory Name Warren & Panzer Engineers Inc. Address 228 East 45 Street New York Address City State Zip Phone NY 10017 Contact Person (212) 922-0077 Time of Inspection from: AS NOTED WEDNESDAY JUNE 26 2002 8100AM WORKERS BEGIN THE CUEANUAS OF THE ROOF AND SET BACK ROOF AREAS. FOR THE PUEPOSES OF AIR MONITERINGi (SAMPUNG), THE DOOF AREAS OF 118 NASSAU, 120 NASSAU, 122 NASSAU AND 124 NASSAN WIL BE TREATED AS ONE WORK ARFA. A REMOTE DECON UNIT HAS BEEN ERECTED ON THE 30D ROQE OF 121 NASSAL STPRET. FRIDAY 5:00PM 6:00PM JUNE 28 2002 WORKERS HAVE COMPLETED THE MAIN ROOF AND SET BACK ROOF AREA I CONDUCT A VISUAL INSPECTION OF THE WORKAREAS AND FIND THAT THEL ARE FREE OE VISIBLE WTC DEBRIS. SUNDAY JUNE 30. 2002 8:00 AM WORKERS BEGIN THE CONSTRUCTION OF A DYKE ON THE SIDEWALK TO COLFET ANY WATER FRRM TLE SCHEDUER FACADE CUEZNUAS Of 1IB NASSAU, RO NASSAU AND 124 NASSAU STREET. A DECON TRUCK WILL BE USED AS THE REMOTE DECOM. 6:00 pM I CONDUCT A VISUAL INSPECTION OF THE FACADE SURFACE AND EINR THAT IT S FREE OF VISIBLE WIC DEBRIS. THE CUEAN-UP PROSECT FOR THIS PREMISE IS NOU COMPLETER FOR TE PURPOSES OE ALR SAMPLING THE FACADES OF THE FOUR BUNDIAGS WERE TREZTED As ONE WORK tREA. NYC-WTC_000098827

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000098827Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →