Facsimile transmittal sheet from Paramount Group dated April 23, 2002, regarding 180 Maiden Lane.

NYC-WTC_000097413–000097436

Folder label: “180 MAIDEN LANE Block: 37 Lot: 23 BIN: 1000874 90-100 Pine St., 71 South St., 73 South St

Page image
Scanned page image, NYC-WTC_000097427
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document Sent By: HP LaserJet 3100; 121244075551 ; Apr-23-02 14:47; Page 15/24

j1 PARAItiYOUN1' ~/ GROUP, INC.

PROGRESS REPORT

PARAMOUNT C=ROLJP, INC 180 MAIDEN LANE

To: Mike Versace, N. Bell:on From: PaulNeira Date: September 22, 2001

Subject: Clean up of fresh air intakes & plenurtts.

At approximately 6pm, I met with Robert from the work area and work to be performed, AI/AA and made a preliminary walkthrough of We coordinated with security and after inspection of and equipment I issued temporary- passes to the following the vehicle individuals: German Torres P11 Hector Vindel ;_._._._._._PII_ _. ._._._ Jose Rendon~._._._ P11 .-.-.- Gotrzalo Arias[._. Pil = _ Rodolfo Sabillor P11 Juan Palomeque _Pii._----- Ismael Nunez;_._._._._._.Pi.i - Ivliguel P:doincques_ _ _ _ _Pin_._._._._. Laila Velez . . ._. .PII._._._._._..i Pablo Palomeque;_._._. .PII._._._._. ; EdgarAsma>L.__ P11 -- -- All equipment and personnel were then moved to the 5r4 floor and primary containment was setup between fans 2 & 3. AA/AI Supervisor briefed workers as to the work to be perlortned, while engineering notified tenants of HVAC shutdown. I spoke with the supervisor regarding concerns I had on protecting the fan intakes, removal of the pigeon gratit:g and the louver, slope cleafiing process.

r;

Engineering assisted AI/AA with power and water hook ups, provided pressure washer and instructed personnel on procedures for filter removal. Secured freight elevator for dock. Engineering also had to snake one of the drains in the plenum tr;trlsportation of dirty filters to loading for water removal, for all other areas the floors were vacuumed.

NYC-WTC 000097427

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000097427Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →