Regulatory Submittal Part 11 -
Environmental Community Air Monitoring Program
Fiterman Hall— 30 West Broadway
Airtek Project 05-0867 — January 10, 2006
Environmental Community Air Monitoring Program
1.0 General:
Environmental air monitoring and visual observation will be conducted during the
remediation and deconstruction of Fiterman Hall located at 30 West Broadway (The Site)
by the Airtek Environmental Corp. (Airtek), the Pei Cobb Freed & Partners Architects,
LLP (PCF-P) Team Environmental Consultant (EC). The proposed program consists of
two primary forms of environmental monitoring: Work Area Monitoring required by law
for environmental remediation. projects and intended to monitor the efficacy of project
engineering controls; and Community Air Monitoring intended to ensure that the
engineering controls designed to protect the community from fugitive releases are
functioning properly and, should any such releases occur, ensure immediate notice
thereof so that appropriate abatement actions may be implemented.
1.1 Operations to Be Monitored
The project schedule includes scaffold erection, six months of gut-strip
contaminants of potential concern (CoPC) abatement and removal, asbestos
abatement and removal under a variance from the NYS DOL, and five months of
conventional deconstruction. The EC' Site Hygienist (SH) will monitor all work
for visible emissions. The Remediation Phase regulated under YS DOL will be
monitored under both a Community Air Monitoring Program, and a Work Area
Monitoring Program. The Deconstruction phase of the project will be monitored
under the Community Air Monitoring Program. All air monitoring conducted
under this plan will be conducted by the EC's New York State DOL certified air
sample technicians under the supervision of the EC's Site Hygienist (SH) and
Certified Industrial Hygienist (CIH).
1.2 Project Monitoring
Monitoring of this project will include all standard monitoring functions for
environmental remediation projects including observations for visible emissions,
air sampling and analyses, inspection and monitoring of the contractor's work
practices, and reporting to the Owner and the Regulators. These general
monitoring functions will be applied to both the Remediation Phase and
Deconstruction Phase of this project.
1.3 Environmental Sampling and Analytic#1 Methodologies
Sampling and analytical methodologies utilized for this Project will comply with
published protocols from EPA and/or National Institute of Occupational Safety
and Health ("NiIOSH"). Where appropriate other published standards may be