Preservation Brief 7: The Preservation of Historic Glazed Architectural Terra-Cotta Page 11 of 14
one of a number of commercially available y, A
waterproof caulking compounds would be appropriate for this work. Holes and static This crack Is being measured. Structural cracking, (non-moving) cracks may be caulked with whether static (nonmoving) or dynamic (moving) should be caulked to prevent water entry Into the glazed butyl sealants or acrylic latex caulks. For architectural terra-cotta system. Photo: NPS files. dynamic (moving or active) cracks, the polysulfide caulks are most often used, although others may be safely employed. It is, however, important to remember that these waterproof caulking compounds are not viable repointing materials and should not be used as such.
Temporary replacement: Temporary replacement measures should be implemented when missing units are scheduled to be replaced but work cannot be undertaken immediately. Lengthy delivery time, prorating of work or seasonal considerations may postpone replacement work. Severe deterioration should at least be ameliorated until work can begin. Temporary repointing, removal and saving of undamaged units to be reset later, or the temporary installation of brick infill to retard further deterioration might be considered.
Removing earlier repairs: Removing earlier repairs may be necessary when the work has either deteriorated or has become visually incompatible. Cementitious stucco, caulkings with black bituminous compounds or brick repair work may become structurally or visually unstable or incompatible and should be removed and properly rehabilitated.
Replacement of glazed architectural terra-cotta: Replacement of severely spalled, damaged, or missing glazed architectural terra-cotta elements is always difficult. Certainly, in-kind replacement is advisable, but it has a number of drawbacks. Stone, fiberglass, and precast concrete are also viable choices, but like in-kind replacement, also have their inherent problems.
Several notes on replacement: When replacing glazed architectural terra-cotta, all of the original deteriorated material should be completely removed. Half bricks or similar cosmetic replacement techniques are not advised.
-- When possible and where applicable, replacement units should be anchored in a manner similar to the original. Both structural and visual compatibility are major considerations when choosing replacement materials.
-- Removing and re-anchoring damaged glazed architectural terra-cotta is an extremely difficult if not impossible task. The complexity of the interlocking system of masonry units, backfill, and metal anchoring system precludes the removal of the glazed architectural terra-cotta unit without destroying it.
-- Re-anchoring deteriorated units is likewise impossible. Therefore, if the terra-cotta in question is loose, severely deteriorated, or its structural integrity in serious question, it is best removed and replaced.
In-kind replacement is possible today, but only on a limited basis. Most new glazed architectural terra-cotta is machine made, not hand made as the original. Thus, the porous tile body of the new material tends to be more uniform but less dense and often not as durable. The glaze on the new glazed architectural terra-cotta tends to be thinner than that on the older material and subsequently more brittle. Machine processing has also produced a glaze that is uniform in color as opposed to historic glazes which were slightly mottled and, therefore, richer. Visual compatibility is an important consideration when replacing in-kind.
Only a fairly limited inventory of in-kind pieces is presently available for replacement such as plain ashlar blocks and the simpler details such as cappings and sills. When http://www2.cr.nps.gov/tps/briefs/briefD7.htm 10/3/2001
NYC-WTC 000093848
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000093852
Brief explaining risks of sandblasting and chemical treatments on historic building materials.
Same agency, volume and box · similarity 0.881
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000093728
Appendix B outlining performance standards and cleaning requirements for historic building exteriors.
Same agency, volume and box · similarity 0.854
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000093788
Fax transmittal from the Mayor's Office regarding a March 2002 meeting with the building group.
Same agency, volume and box · similarity 0.829
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164903
Forwarded programmatic agreement documentation addressing post-disaster building cleaning procedures and eligible building list for recovery efforts.
Similar document embedding; no shared entity or topic indexed. · similarity 0.845
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000125098
Protocol document outlining air sampling and monitoring procedures for 130 Cedar Street.
Similar document embedding; no shared entity or topic indexed. · similarity 0.827
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000152327
A financial document from late September 2001 related to water supply operations and emergency response costs.
1 shared topics · similarity 0.825
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000150931
Cover fax from the Mayor's Office forwarding DEP documents regarding exterior clean-up to be reviewed before a meeting with building owners.
Similar document embedding; no shared entity or topic indexed. · similarity 0.824
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000166488
Department of Buildings report containing findings and recommendations regarding the World Trade Center site.
Similar document embedding; no shared entity or topic indexed. · similarity 0.821
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000153308
Draft advisory outlining required safety assessments and utility checks before allowing residents to return to buildings near the World Trade Center.
Similar document embedding; no shared entity or topic indexed. · similarity 0.818
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000139257
DEP official requests final review of the latest air monitoring Scope of Work to conclude negotiations.
1 shared non-person entities · similarity 0.817
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000128425
Document excerpt describing compliance requirements for environmental remediation work at 94 Greenwich Street.
Similar document embedding; no shared entity or topic indexed. · similarity 0.816
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000111934
Document outlining regulatory compliance and follow-up visual assessments conducted by DEP at buildings near the World Trade Center.
Similar document embedding; no shared entity or topic indexed. · similarity 0.815
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000093580
Archival reference document with minimal visible content related to WTC-era landmark information.
Filed in the same folder
NYC-WTC_000093581
Administrative record from the Landmark Information folder regarding the World Trade Center site.
Filed in the same folder
NYC-WTC_000093582
Administrative record from the Landmark Information folder regarding the World Trade Center site.
Filed in the same folder
NYC-WTC_000093583
Landmarks Preservation Commission notice withdrawing an application for alterations at 192 Broadway due to lack of landmark status.
Filed in the same folder
Permit for minor work issued by the Landmarks Preservation Commission for alterations at 55 Liberty Street.
Filed in the same folder