Browse records
The order the City kept.
Follow the collection, box and handwritten folder label to the documents inside.
Documents in this folder
Folder label / City-provided: As requested this is the equipment deletion distribution for the valve engineering package
1 documents · 2 pages
Value engineering memo, 7 World Trade Center, September 1998 ↗
2 pagesNYC-WTC_000173442 – NYC-WTC_000173443
Fax cover transmitting a value engineering comparison between change order #4 and exhibit A for the 7 WTC construction project.