NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
Collection → topic

Wrecking and debris compaction at the World Trade Center site

← Whole collection · Parent topic

3657 indexed pages · 3657 indexed documents

Records of demolition activities, waste handling, and daily workforce reports for the World Trade Center cleanup.

machine-extracted · confidence 0.92 · Check page ↗

wreckers · genie · deliveries · dumps · unmanned · elevations · compaction · millings · flats · compression · fdny · accommodate

Machine extraction can misread a scan. Check the source page. Stored confidence scores are extractor outputs, not a guarantee of accuracy; regex matches currently carry 1.00.

Sub-topics

No sub-topics indexed.

Documents in this topic

Ordered by assignment probability. A document-level assignment does not establish that every page is about this subject.

Daily work force report, World Trade, Feb 2002

Machine-extracted title

NYC-WTC_000291340

Night final daily workforce and equipment for World Trade Center, Feb 3, 2002.

Design and Construction, Dept. of · Box unavailable · assignment probability 0.668

machine-extracted · confidence 0.67 · Check page ↗

Daily work force report, World Trade, Nov 22, 2001

Machine-extracted title

NYC-WTC_000388489

Preliminary daily workforce and equipment at World Trade site, Grace Contracting, Nov 22, 2001.

Design and Construction, Dept. of · Box unavailable · assignment probability 0.668

machine-extracted · confidence 0.67 · Check page ↗

Daily work force report, World Trade, Dec 30 2001

Machine-extracted title

NYC-WTC_000280131

Day shift daily workforce and equipment details for World Trade Center site, Dec 30, 2001.

Design and Construction, Dept. of · Box unavailable · assignment probability 0.667

machine-extracted · confidence 0.67 · Check page ↗

Daily work force report, WTC site, Feb 2002

Machine-extracted title

NYC-WTC_000263652

Night final daily workforce report for World Trade Center project (2/1/02).

Design and Construction, Dept. of · Box unavailable · assignment probability 0.667

machine-extracted · confidence 0.67 · Check page ↗

Daily work force report, WTC site, Nov 2001

Machine-extracted title

NYC-WTC_000305276

Final daily workforce and equipment roster for World Trade Center project, Nov 2001.

Design and Construction, Dept. of · Box unavailable · assignment probability 0.667

machine-extracted · confidence 0.67 · Check page ↗

Daily work force report, World Trade Center

Machine-extracted title

NYC-WTC_000290079

Day final daily workforce and equipment at World Trade Center site.

Design and Construction, Dept. of · Box unavailable · assignment probability 0.666

machine-extracted · confidence 0.67 · Check page ↗